Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 8 - BID SECURITY <br />8.01 ' " Each Bid must be accompanied by Bid Security made payable to OWNER in the <br />amount of five percent of the Bidder's maximum base bid price and in the form. of a certified <br />check; cashier's check; or an AIA Document A310 Bid Bond issued by a surety meeting the <br />requirements of Paragraph 5.01 of the General Conditions. The Bid Bond shall be executed by <br />such sureties as are named in the current list of "Companies Holding Certificates of Authority as <br />Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in <br />Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. <br />Department of the Treasury. The Surety must be authorized to issue surety bonds in Florida. <br />The Bidder shall require the attorney-in-fact who executes any Bond, to affix to each a current <br />certified -copy of their Power of Attorney, reflecting such person's authority as Power of Attorney <br />in the State of Florida. Further, at the time of execution of the Contract, the Successful Bidder <br />shall for all Bonds, provide a copy of the Surety's current valid Certificate of Authority issued by <br />the United States Department of the Treasury under 31 United States Code sections 9304- <br />9308. The Surety shall also meet the requirements of paragraphs 5.01 and 5.02 of the General <br />Conditions. <br />8.02 The Bid security of the Successful Bidder will be retained until such Bidder has <br />executed the Contract Documents, furnished the required contract security and met the other <br />conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful <br />Bidder fails to execute and deliver the Contract Documents and furnish the required contract <br />security within 15 days after the Ndtice of Award, ,OWNER may annul the Notice of Award and the <br />Bid security of that Bidder will be retained by the owner. The Bid Security of other Bidders whom <br />OWNER believes to have a reasonable chance of receiving the award may be retained by <br />OWNER until the earlier of seven days after the Effective Date of the Agreement or 91 days after <br />the Bid opening, whereupon Bid Security furnished by such Bidders will be returned. <br />8.03 Bid Security of other Bidders whom OWNER believes do not have a reasonable <br />chance of receiving the award will be returned within seven days after the Bid opening. <br />ARTICLE 9 - CONTRACT TIMES <br />9.01 The number of calendar days within which, or the dates by which, the Work is to be (a) <br />Substantially Completed and (b) also completed and ready for final payment are set forth in the <br />Agreement. <br />ARTICLE 10 - LIQUIDATED DAMAGES <br />10.01 Provisions for liquidated damages, if any, are set forth in the Agreement. <br />ARTICLE 11 - SUBSTITUTE AND "OR -EQUAL" ITEMS <br />11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or <br />described in the Bidding Documents without consideration of possible substitute or "or -equal" <br />items. Whenever it is specified or described in the Bidding Documents that a substitute or "or - <br />equal" item of material or equipment may be fumished or used by CONTRACTOR if acceptable to <br />ENGINEER, application for such acceptance will not be considered by ENGINEER until after the <br />00200 - Instructions to Bidders REV 04-07. <br />00200 - 5 <br />F \Public Works\ENGINEERING DIVISION PROJECTS11304-CR 512 Resurf (SCOP)_125th Ave to 1-95tAdmim\bid documents\Master Contract Documents\00200 - <br />-. Instructions to Bidders REV 04-07.doc Rev. 05/01 - <br />