My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-221A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-221A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 12:56:59 PM
Creation date
12/9/2015 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/17/2015
Control Number
2015-221A
Agenda Item Number
8.G.
Entity Name
Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- c. where one or more tiers of subcon- <br />.tracts are on the basis of Cost of the Work <br />plus a fee and no fixed fee is agreed upon, <br />the intent of paragraph 12.01.C.2.a is that <br />the Subcontractor who actually performs <br />the Work, at whatever tier, will be paid a fee <br />of 15 percent of the costs incurred by such <br />Subcontractor under paragraphs 11.01.A.1 <br />and 11 01.A.2 and that any higher tier <br />Subcontractor and CONTRACTOR will <br />each be paid a fee of five percent of the <br />amount paid to the next lower tier Subcon- <br />tractor, <br />d. no fee shall be payable on the <br />basis of costs itemized under paragraphs <br />11 01.A.4, 11.01.A.5, and 11.01.B, <br />e. the amount of credit to be allowed <br />by CONTRACTOR to OWNER for any <br />change which results in a net decrease in <br />cost will be the amount of the actual net <br />decrease in cost plus a deduction in <br />CONTRACTOR's fee by an amount equal <br />to five percent of such net decrease, and <br />f. when both additions and credits are <br />involved in any one change, the adjustment <br />in CONTRACTOR's fee shall be computed <br />on the basis of the net change in <br />accordance with paragraphs 12.01 C.2 -.a <br />through 12.01.C.2.e, inclusive. <br />12.02 Change of Contract Times <br />A. The Contract Times (or Milestones) may only <br />be changed by a Change Order or by a Written <br />Amendment. Any Claim for an adjustment in the <br />Contract Times (or Milestones) shall be based on <br />written notice submitted by the party making the claim <br />to the ENGINEER and the other party to the Contract <br />in accordance with the provisions of paragraph 10.05 <br />B. Any adjustment of the Contract Times (or <br />Milestones) covered by a Change Order or of any <br />Claim for an adjustment in the Contract Times (or <br />Milestones) will be determined in accordance with the <br />provisions of this Article 12. <br />12 03 Delays Beyond CONTRACTOR's Control <br />A. Where CONTRACTOR is prevented from <br />completing any part of the Work within the Contract <br />Times (or Milestones) due to delay beyond the control <br />of CONTRACTOR, the Contract Times (or <br />Milestones) will be extended in an amount equal to the <br />time lost due to such delay if a Claim is made therefor <br />as provided in paragraph 12.02.A. Delays beyond the <br />control of CONTRACTOR shall include, but not be <br />limited to, acts or neglect by OWNER, acts or neglect <br />of utility owners or other contractors performing other <br />work as contemplated by Article 7, fires, floods, <br />epidemics, abnormal weather conditions, or acts of <br />God <br />12.04 Delays Within CONTRACTOR's Control <br />A. The Contract Times (or Milestones) will not be <br />extended due to delays within the control of <br />CONTRACTOR. Delays attributable to. and within the <br />control of a Subcontractor or Supplier shall be <br />deemed to be delays within the control of CONTRAC- <br />TOR. <br />12.05 Delays Beyond OWNER's and <br />CONTRACTOR's Control <br />A. Where CONTRACTOR is prevented from <br />completing any part of the Work within the Contract <br />Times (or Milestones) due to delay beyond the control <br />of both OWNER and CONTRACTOR, an extension of <br />the Contract Times (or Milestones) in an amount <br />equal to the time lost due to such delay shall be <br />CONTRACTOR's sole and exclusive remedy for such <br />delay <br />12.06 Delay Damages <br />A. In no event shall OWNER or ENGINEER be <br />liable to CONTRACTOR, any Subcontractor, any <br />Supplier, or any other person or organization, or to any <br />surety for or employee or agent of any of them, for <br />damages arising out of or resulting from: <br />1. delays caused by or within the control <br />of CONTRACTOR; or <br />2. delays beyond the control of both <br />OWNER -and CONTRACTOR including but not <br />limited to fires, floods, epidemics, abnormal <br />weather conditions, acts of God, or acts or <br />neglect by utility owners or other contractors <br />performing other work as contemplated by <br />Article 7 <br />B Nothing in this paragraph 12.06 bars a <br />change in Contract Price pursuant to this Article 12 to <br />compensate CONTRACTOR due to delay, <br />interference, or disruption directly attributable to <br />actions or inactions of OWNER or anyone for whom <br />OWNER is responsible. <br />00700 - General Conditions REV 5-10-13 <br />00700 - 35 <br />F•1Public Works\ENGINEERING DIVISION PROJECTS\1304-CR 512 Resurf (SCOP)_125th St to I-951Admim\bid documents\Master Contract Documents\00700 - General Conditions REV <br />5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.