My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-221A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-221A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 12:56:59 PM
Creation date
12/9/2015 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/17/2015
Control Number
2015-221A
Agenda Item Number
8.G.
Entity Name
Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. the Work is defective, or completed <br />Work has been damaged, requiring <br />- correction or replacement; <br />b. the Contract Price has been reduced <br />by Written Amendment or Change Orders, <br />c. OWNER has been required to correct <br />defective Work or complete Work in accor- <br />dance with paragraph 13.09; or <br />d. ENGINEER has actual knowledge of <br />the occurrence of any of the events enumer <br />ated in paragraph 15.02.A. <br />C. Payment Becomes Due <br />1. Ten days after presentation of the <br />Application for Payment to OWNER with <br />ENGINEER's recommendation, the amount <br />recommended will (subject to the provisions of <br />due will be paid by OWNER to CONTRACTOR. <br />D Reduction in Payment <br />1. OWNER may refuse to make <br />payment of the full amount recommended by <br />ENGINEER because: <br />a. claims have been made against <br />OWNER on account of CONTRACTOR's <br />performance or furnishing of the Work; <br />b Liens have been filed in connection <br />with- the Work, except where <br />CONTRACTOR has delivered a specific <br />Bond satisfactory to OWNER to secure the <br />satisfaction and discharge of such Liens; <br />c. there are other items entitling OWN- <br />ER to a set-off against the amount <br />recommended; or <br />d. OWNER has actual knowledge of the <br />occurrence of any of the events enumerated <br />in paragraphs 14.02.6 5.a through <br />14 02.B 5.c or paragraph 15 02.A. <br />2. If OWNER refuses to make payment <br />of the full amount recommended by <br />ENGINEER, OWNER must give <br />CONTRACTOR immediate -written notice (with <br />a copy to ENGINEER) stating the reasons for <br />such action and promptly pay CONTRACTOR <br />any amount remaining after deduction of the <br />amount so withheld. OWNER shall promptly <br />pay CONTRACTOR the amount so withheld, or <br />any adjustment thereto agreed to by OWNER <br />and CONTRACTOR, when CONTRACTOR <br />corrects to OWNER's satisfaction the reasons <br />for such action. <br />3. If it is subsequently .determined that <br />OWNER's refusal of payment was not justified, <br />the amount wrongfully withheld shall be treated <br />as an amount due as determined by paragraph <br />14-02.C.1: <br />14.03 CONTRACTOR's Warranty of Title <br />A. CONTRACTOR warrants and guarantees <br />that title to all Work, materials, and equipment covered <br />by any Application for Payment, whether incorporated <br />in the Project or not, will pass to OWNER no later than <br />the time of payment free and dear of all Liens. <br />14 04 Substantial Completion <br />A. When CONTRACTOR considers the entire <br />Work ready for its intended use CONTRACTOR shall <br />notify OWNER and ENGINEER in writing that the <br />entire Work is substantially complete (except for items <br />specifically listed by CONTRACTOR as incomplete) <br />and request that ENGINEER issue a certificate of <br />Substantial ' Completion. Promptly thereafter, <br />OWNER, CONTRACTOR, and ENGINEER shall <br />make an inspection of the Work to determine the <br />status of completion. If ENGINEER does not consider <br />the Work substantially complete, ENGINEER will <br />notify CONTRACTOR in writing giving the reasons <br />therefore If ENGINEER considers the Work <br />Completion. There shall be attached to the certificate <br />before final payment. OWNER shall have seven days <br />provisions of the certificate or attached list. If, after <br />that the Work is not substantially complete, <br />consideration of OWNER's objections, ENGINEER <br />considers the Work substantially complete, <br />tentative list of items to be completed or corrected) <br />as ENGINEER believes justified after consideration of <br />00700 - General Conditions REV 5-10-13 <br />00700 - 40 <br />F \Public Wdrks\ENGINEERING DIVISION PROJECTS11304-CR 512 Resurf (SCOP) 125th St to I-95'Admim\bid documentslMaster Contract Documents100700 - General Conditions REV <br />5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.