Laserfiche WebLink
SECTION 00800 - SUPPLEMENTARY CONDITIONS <br />TO THE GENERAL CONDITIONS <br />Article Title Article Number <br />Introduction SC – 1.00 <br />Defined Terms SC – 1.01 <br />Terminology SC —1.02 <br />Before Starting Construction SC – 2.05 <br />Preconstruction Conference SC – 2.06 <br />Coordination of Plans, Specifications, and Special Provisions SC – 3.06 <br />Subsurface and Physical Conditions SC – 4 02 <br />Performance, Payment and Other Bonds SC – 5.01 <br />Certificates of Insurance SC – 5.03 <br />CONTRACTOR's Liability Insurance SC – 5.04 <br />OWNER's Liability Insurance SC – 5.05 <br />Property Insurance SC – 5.06 <br />Waiver of Rights SC – 5 07 <br />Receipt and Application of insurance Proceeds SC – 5.08 <br />Acceptance of Bonds and Insurance; Option to Replace SC – 5.09 <br />Labor; Working Hours SC – 6.02 <br />Concerning Subcontractors, Suppliers and Others SC – 6.06 <br />Permits SC – 6.08 <br />Cost of the Work SC – 11.01 <br />Test and Inspections SC – 13.03 <br />OWNER May Stop the Work SC – 13.05 <br />Correction Period SC – 13.07 <br />Progress Payments SC – 14.02 <br />Substantial Completion SC – 14.04 <br />00800-i <br />- 00800 - Supplementary Conditions 05-13 rev <br />00800 IF•\Public Works\ENGINEERING DIVISION PROJECTS\1304-CR 512.Resurf (SCOP)_125th Ave to I-95Wdmim\bid documents\Master Contract Documents100800 - <br />Supplementary .Conditions 05-13 rev.doc <br />