Laserfiche WebLink
progresses. Control delivery schedules sq as to minimize unnecessary long-term <br />storage at the project site prior to installation. <br />1.5 PROJECT PHOTOGRAPHSNIDEOS <br />A. -The CONTRACTOR shall make provisions, at his expense, for photographs and <br />video tapes of ail work areas just prior to construction, and for unusual conditions <br />during construction. The photographs and videos shall show pertinent physical <br />features long the line of construction. The purpose of the videos is to determine <br />any damage to private or public property during construction. The video must be <br />performed by a professional videographer. <br />B. Pre -Construction Photographs and Video: <br />1. Contractor shall provide the Owner with photographs and video record and one <br />copy of the existing conditions prior to construction. These photographs and <br />videos shall be a standard DVD format and shall be narrated. <br />2. The photographs and video shall include, but not be limited to, the following <br />items shown in a clear manner: <br />1) All existing features within the right-of-way. <br />2) AH existing features within the temporary construction easement. <br />3) All existing features within permanent easements. <br />4) All existing features adjacent to any construction. <br />3. Detail of the photographs and video shall be such that the following examples <br />shall be clear and visible: <br />1) Cracks in walls. <br />2) Condition of fencing. <br />3) Condition of planted areas and types of vegetation. <br />4) Condition of sodded areas. <br />5) Conditions of sprinkler systems and associated controls and wiring <br />6) Condition of signs. <br />7) Conditions of lighting and associated wiring. <br />8) Significant detail of any pre-existing damages physical features shall be <br />shown. The coverage of the photographs and video should include the <br />_limits of effects of the use of vibratory rollers. <br />9) These photographs and video record shall be presented and approved <br />by the Owner prior to the Notice to Proceed. A copy shall be kept in the <br />Contractor's field office. <br />10) Payment — No additional payment will be made for this work. <br />+ + END OF SECTION + + <br />01215-2 01215 General Quality Control <br />F\Public Works\ENGINEERING DIVISION PROJECTS \1304 -CR 512 Resurf (SCOP)_125th St to I-95\Admim\bid documents Master <br />Contract <br />Documents\01215 <br />General Quality.doc <br />