My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-221A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-221A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 12:56:59 PM
Creation date
12/9/2015 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/17/2015
Control Number
2015-221A
Agenda Item Number
8.G.
Entity Name
Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01340 <br />Submittal of Shop Drawings <br />1.5 CONTRACTOR'S RESPONSIBILITIES FOR SUBMITTAL OF SHOP <br />DRAWINGS, PRODUCT DATA AND SAMPLES <br />A. The CONTRACTOR's responsibilities for submittal of shop drawings, <br />product data, and samples are set forth in paragraph 6.17 of the General <br />Conditions and as further explained herein. <br />B. Prior to submission, thoroughly check shop drawings, product data, and <br />samples for completeness and for compliance with the Contract <br />Documents, verify all dimensions and field conditions, and coordinate the <br />shop drawings with the requirements for other related work. Also review <br />each shop drawing before submitting it to the ENGINEER to determine <br />that it is acceptable in terms of the means, methods, techniques, <br />sequences and operations of construction, safety precautions and <br />programs incidental thereto, all of which are the CONTRACTOR's <br />responsibility. <br />1. It is CONTRACTOR'S responsibility to review submittals made by <br />his suppliers and Subcontractors before transmitting them to <br />ENGINEER to assure proper coordination of the Work and to <br />determine that each submittal is in accordance with its desires and <br />that there is sufficient information about materials and equipment <br />for ENGINEER to determine compliance with the Contract <br />Documents. <br />2. - Incomplete or inadequate submittalswill be returned for revision <br />without review. <br />C. The CONTRACTOR's responsibility for errors and omissions in submittals <br />is not relieved by the ENGINEER's review of submittals. The <br />CONTRACTOR shall approve the shop drawings based on his in -the -field <br />measurements, prior to submittal to the ENGINEER for his review. <br />D. Notify the ENGINEER, in writing at the time of submission, of deviations in <br />submittals from the requirements of the Contract Documents. The <br />CONTRACTOR's responsibility for deviations in submittals from the <br />requirements of the Contract Documents is not relieved by the <br />ENGINEER's review of submittals, unless the ENGINEER gives written <br />acceptance of specific deviations. <br />E. Begin no work, which requires submittals until return of submittals with the <br />ENGINEER's stamp and initials or signature indicating the submittal has <br />been reviewed. <br />01340 - Submittal of Shop Drawings <br />01340-2 <br />F1Public Works\ENGINEERING DIVISION PROJECTS\1304-CR 512 Resurf (SCOP)_125th Ave to I-95\Admim\bid documents\Master Contract <br />Documents101340 - Submittal of Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.