My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-221A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-221A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 12:56:59 PM
Creation date
12/9/2015 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/17/2015
Control Number
2015-221A
Agenda Item Number
8.G.
Entity Name
Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01340 <br />Submittal of Shop Drawings <br />M. Upon return of a submittal marked "Revise and Resubmit", make the <br />corrections indicated and repeat the initial approval procedure. The "Not <br />Approved" notation is used to indicate material or equipment that is not <br />acceptable. Upon return of a submittal so marked, repeat the initial <br />approval procedure utilizing acceptable material or equipment. <br />N. Any related Work performed or equipment installed without an "Approved" <br />or "Approved as Corrected" Shop Drawing will be at the sole responsibility <br />of the CONTRACTOR. <br />O. Submit Shop Drawings well in advance of the need for the material or <br />equipment for construction and with ample allowance for the time required <br />to make delivery of material or equipment after data covering such is <br />approved. CONTRACTOR shall assume therisk for all materials or <br />equipment which is fabricated or delivered prior to the approval of Shop <br />Drawings. Materials or equipment will not be included in periodic progress <br />payments until approval thereof has been obtained in the specified <br />manner. <br />P ENGINEER will review and process all submittals promptly, but a <br />reasonable time should be allowed for this, for the Shop Drawings being <br />revised and resubmitted, and for time required to return the approved <br />Shop Drawings to CONTRACTOR. <br />O. Furnish required submittals with complete information and accuracy in <br />order to achieve required approval of an item within three submittals. All <br />costs to ENGINEER involved with subsequent submittals of Shop <br />Drawings, Samples or other items requiring approval, will be back -charged <br />to CONTRACTOR in accordance with the General Conditions and the <br />Supplementary Conditions. If the CONTRACTOR requests a substitution <br />for a previously approved item, all of ENGINEER'S costs in the reviewing <br />and approval of the substitution will be back -charged to CONTRACTOR <br />unless the need for such substitution is beyond the control of <br />CONTRACTOR. <br />+ + END OF SECTION + + <br />01340 - Submittal of Shop Drawings <br />01340-6 <br />F.\Public Works\ENGINEERING DIVISION PROJECTS\1304-CR 512 Resurf (SCOP)_125th Ave to I-95\Admim\bid documents\Master Contract <br />Documents101340 - Submittal of Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.