My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-221A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-221A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 12:56:59 PM
Creation date
12/9/2015 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/17/2015
Control Number
2015-221A
Agenda Item Number
8.G.
Entity Name
Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAFFIC CONTROL - STANDARDS: The FDOT Design Standards For Design, <br />Construction, Maintenance and Utility Operations On The State Highway System, <br />Edition as dated on the plans set forth the basic principles and prescribes minimum <br />standards to be followed in the design, application, installation, maintenance and <br />removal of all traffic control devices and all warning devices and barriers which are <br />necessary to protect the public and workmen from hazards within the project limits. <br />The standards established in the aforementioned manual constitute the minimum <br />requirements for normal conditions, and additional traffic control devices warning <br />devices, barriers or other safety devices will be required where unusual, complex or <br />particularly hazardous conditions exist. <br />The above referenced .standards were developed using F.H.W.A., U.S.D.O.T. Manual <br />on Uniform Traffic Control Devices (MUTCD). <br />D. TRAFFIC CONTROL DEVICES, WARNING DEVICES AND BARRIERS - <br />INSTALLATION: The responsibility for installation and maintenance of adequate traffic <br />control devices, warning devices and barriers, for the protection of the travel in public <br />and workmen, as well as to safeguard the work area in general shall rest with the <br />Contractor. Consideration shall be given to recommendations of the Engineer. The <br />required traffic control devices, warning devices and barriers shall be erected by the <br />Contractor prior to creation of any hazardous condition and in conjunction with any <br />necessary re-routing of traffic. The Contractor shall immediately remove, turn or cover <br />any devices or barriers which do not apply to existing conditions. All traffic control <br />devices shall conform to MUTCD standards and shall be clean and relatively <br />undamaged. Damaged devices diminishing legibility and recognition, during either <br />night or day conditions, are not acceptable for use. <br />E. NO WAIVER OF LIABILITY: The Contractor shall conduct his operations in such a <br />manner that no undue hazard will result due to the requirements of this article, and the <br />procedures and policies described therein shall in no way act as a waiver of any of the <br />terms of the liability of the Contractor or his surety. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 102-1 - Maintenance of Traffic - Lump Sum <br />01025-12 Technical Specifications <br />F.\Public Works\ENGINEERING DIVISION PROJECTS \1304 -CR 512 Resurf (SCOP)_125th Ave to I-95\Admim\bid documenis\Master <br />Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.