My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-221A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-221A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 12:56:59 PM
Creation date
12/9/2015 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/17/2015
Control Number
2015-221A
Agenda Item Number
8.G.
Entity Name
Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. 1 <br />PROJECT: County Road 512 Resurfacing from 125th Avenue to 1-95 <br />BID NO. 2016003 <br />PROJECT NO. 1304 <br />*****This Addendum MUST be completed and returned with your Bid********** <br />ADDENDUM NO. 1 is submitted by <br />and <br />Richard B. Szpyr a, P.E., Assistant Public Works Director <br />Jennifer Hyde, Purchasing Manager <br />Company Name Ranger Construction Industries, Inc. <br />Name: <br />F. Scott Fowler <br />(Type / Printed <br />Authorized Signature: .� Date: October 14, 2015 <br />Title: Vice President <br />Telephone: (772) 464-6460 Fax: (772) 466-9559 <br />Page 4 of 4 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1304 -CR 512 Reswf (SCOP)_125th Ave to 1-951Admim\bid documents\Addendum 0I\Addendum No. 1 1304 CR -512 092915.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.