My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-221A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-221A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 12:56:59 PM
Creation date
12/9/2015 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/17/2015
Control Number
2015-221A
Agenda Item Number
8.G.
Entity Name
Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page4of5 <br />CERTIFICATION OF ENGINEER: <br />I certify that I have reviewed the above and foregoing Periodic Estimate for Partial <br />Payment; that to the best of my knowledge and belief it appears to be a reasonably <br />accurate statement of the work performed and/or material supplied by the Contractor. I am _ <br />not certifying as to whether or not the Contractor has paid all subcontractors, laborers, <br />materialmen and suppliers because I am not in a position to accurately determine that <br />issue. <br />Dated <br />SIGNATURE <br />CERTIFICATION OF -INSPECTOR: <br />I have checked the estimate against the Contractor's Schedule of Amounts for Contract <br />Payments and the notes and reports of my inspections of the project. To the best of my <br />knowledge, this statement of work performed and/or materials supplied appears to be <br />reasonably accurate, that the Contractor appears to beā¢observing the requirements of the <br />Contract with respect to construction, and that the Contractor should be paid the amount <br />requested above, unless otherwise noted by .me. I am not certifying as to whether or not <br />the Contractor has paid all subcontractors, laborers, materialmen and suppliers because <br />am not in a position to accurately determine that issue. <br />Dated <br />SIGNATURE <br />[The Remainder of This Page Was Left Blank Intentionally] <br />00622 - 4 <br />F \Public Works\ENGINEERING DIVISION PROJECTS\1304-CR 512 Resurf (SCOP)_125th Ave to 1-95\Admim\bid documents'Master Contract Documents100622 - Contractor's <br />Application for Payment - 03-10 rev.doc Rev 05/01 <br />00622 - Contractors Application for Payment - 03-10 rev <br />
The URL can be used to link to this page
Your browser does not support the video tag.