Laserfiche WebLink
TABLE OF CONTENTS <br />Title Page <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY 5 <br />1.01 Defined Terms 5 <br />1.02 Terminology ............... ...... 7 <br />ARTICLE 2 - PRELIMINARY MATTERS.. 8 <br />2.01 Delivery of Bonds 8 <br />2.02 Copies of Documents 8 <br />2.03 Commencement of Contract Times; Notice to Proceed 8 <br />2.04 Starting the Work 8 <br />2.05 Before Starting Construction 8 <br />2.06 Preconstruction Conference 9 <br />2.07 Initial Acceptance of Schedules .. 9 <br />ARTICLE 3 - CONTRACT DOCUMENTS. INTENT, AMENDING, REUSE. 9 <br />3 01 Intent 9 <br />3.02 Reference Standards ........ 10 <br />3 03 Reporting and Resolving Discrepancies... 10 <br />3.04 Amending and Supplementing Contract Documents 10 <br />3.05 Reuse of Documents 10 <br />ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE <br />POINTS 11 <br />4 01 Availability of Lands 11 <br />4.02 Subsurface and Physical Conditions .. 11 <br />4.03 Differing Subsurface or Physical Conditions ......... .... 11 <br />4.04 Underground Facilities .. 12 <br />4.05 Reference Points 13 <br />4 06 Hazardous Environmental Condition at Site .... 13 <br />ARTICLE 5-- BONDS AND INSURANCE 14 <br />5.01 Performance, Payment, and Other Bonds............ 14 <br />5.02 Licensed Sureties and Insurers 15 <br />5.03 Certificates of Insurance 15 <br />5.04 CONTRACTOR's Liability insurance 15 <br />5.05 OWNER's Liability Insurance 16 <br />5.06 Property Insurance 16 <br />5.07 Waiver of Rights 17 <br />5.08 Receipt and Application of Insurance Proceeds 18 <br />5.09 Acceptance of Bonds and insurance; Option to Replace 18 <br />5.10 Partial Utilization, Acknowledgment of Property Insurer 18 <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES .18 <br />6.01 Supervision and Superintendence 18 <br />6.02 Labor; Working Hours 19 <br />6.03 Services, Materials, and Equipment 19 <br />6.04 Progress Schedule 19 <br />6.05 Substitutes and "Or -Equals" 19 <br />6.06 Concerning Subcontractors, Suppliers, and Others 21 <br />00700 - General Conditions REV 5-10-13 <br />00700 - 2 <br />P•\Public Works\ENGINEERING DIVISION PROJECTS11304-CR 512 Resurf (SCOP)_125th Ave to I-95\Admim\bid documents Master Contract Documents\00700 - General Conditions REV 5-10-13.doc <br />