My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-221A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-221A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 12:56:59 PM
Creation date
12/9/2015 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/17/2015
Control Number
2015-221A
Agenda Item Number
8.G.
Entity Name
Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />Title Page <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY 5 <br />1.01 Defined Terms 5 <br />1.02 Terminology ............... ...... 7 <br />ARTICLE 2 - PRELIMINARY MATTERS.. 8 <br />2.01 Delivery of Bonds 8 <br />2.02 Copies of Documents 8 <br />2.03 Commencement of Contract Times; Notice to Proceed 8 <br />2.04 Starting the Work 8 <br />2.05 Before Starting Construction 8 <br />2.06 Preconstruction Conference 9 <br />2.07 Initial Acceptance of Schedules .. 9 <br />ARTICLE 3 - CONTRACT DOCUMENTS. INTENT, AMENDING, REUSE. 9 <br />3 01 Intent 9 <br />3.02 Reference Standards ........ 10 <br />3 03 Reporting and Resolving Discrepancies... 10 <br />3.04 Amending and Supplementing Contract Documents 10 <br />3.05 Reuse of Documents 10 <br />ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE <br />POINTS 11 <br />4 01 Availability of Lands 11 <br />4.02 Subsurface and Physical Conditions .. 11 <br />4.03 Differing Subsurface or Physical Conditions ......... .... 11 <br />4.04 Underground Facilities .. 12 <br />4.05 Reference Points 13 <br />4 06 Hazardous Environmental Condition at Site .... 13 <br />ARTICLE 5-- BONDS AND INSURANCE 14 <br />5.01 Performance, Payment, and Other Bonds............ 14 <br />5.02 Licensed Sureties and Insurers 15 <br />5.03 Certificates of Insurance 15 <br />5.04 CONTRACTOR's Liability insurance 15 <br />5.05 OWNER's Liability Insurance 16 <br />5.06 Property Insurance 16 <br />5.07 Waiver of Rights 17 <br />5.08 Receipt and Application of Insurance Proceeds 18 <br />5.09 Acceptance of Bonds and insurance; Option to Replace 18 <br />5.10 Partial Utilization, Acknowledgment of Property Insurer 18 <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES .18 <br />6.01 Supervision and Superintendence 18 <br />6.02 Labor; Working Hours 19 <br />6.03 Services, Materials, and Equipment 19 <br />6.04 Progress Schedule 19 <br />6.05 Substitutes and "Or -Equals" 19 <br />6.06 Concerning Subcontractors, Suppliers, and Others 21 <br />00700 - General Conditions REV 5-10-13 <br />00700 - 2 <br />P•\Public Works\ENGINEERING DIVISION PROJECTS11304-CR 512 Resurf (SCOP)_125th Ave to I-95\Admim\bid documents Master Contract Documents\00700 - General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.