My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/25/1985
CBCC
>
Meetings
>
1980's
>
1985
>
9/25/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:31 AM
Creation date
6/12/2015 11:09:16 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/25/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: THE HONORABLE BOARD OF DATE: SEPTEMBER 18, 1985 <br />COUNTY COMMISSIONERS <br />THRU: TERRANCE G. PINTG SUBJECT: ENGINEERING SERVICES <br />DIRECTOR, DIVISION INDIAN RIVER COUNTY <br />OF UTILITY SERVICES LANDFILL <br />FROM: RONALD R. BROOKS, ENVIRONMENTAL <br />ENGINEERING SPECIALIST <br />DESCRIPTION AND CONDITIONS <br />Indian River County advertised for and subsequently received on July 26, <br />1985, proposals for engineering services in solid waste management and the <br />design and operation of landfills. The scope of services that were to be <br />provided are as follows: <br />1. Development of a Solid Waste Management Master Plan addressing <br />the following as a minimum <br />A. Evaluation of existing facilities and operations. <br />B. Investigation of alternative methods of solid waste disposal. <br />C. Feasibility of a County operated hazardous waste collection, <br />storage and transfer operations. <br />D. Evaluation and feasibility of solid waste compaction and/or <br />• transfer stations. <br />E. Investigation of the treatment and disposal of waste sludges and <br />septage. <br />F. Evaluation of composting. <br />2. Design, preparation of plans and construction supervision of <br />required improvements in the landfill facility. <br />3. Design and preparation of plans and specifications for the <br />closing of Phase I and the construction of Phase II of the Landfill. <br />The following engineering firms submitted proposals: <br />1. <br />2. <br />3. <br />4. <br />Camp Dresser & McKee Inc. <br />Post, Buckley, Schuh & Jernigan <br />William M. Bishop <br />Gee & Jenson in association with Heyden-Wegman and Geraghty and <br />Miller <br />The four firms made a formal presentation before a Selection Committee on <br />August 12, 1985. The Selection Committee requested the two most qualified <br />firms (Camp Dresser & McKee Inc. and Gee & Jenson, et al) to provide a <br />second presentation with those individuals who would actually be working on <br />the project in attendance. A second presentation was provided by Camp <br />Dresser & McKee, Inc. and Gee & Jenson, et al, on September 13, 1985. At <br />that time the Selection Committee chose Camp Dresser & McKee Inc. as the <br />number one choice. <br />SEP 25 1985 <br />16a„,, , <br />BOOK �� FAG€ c'.Ow � <br />
The URL can be used to link to this page
Your browser does not support the video tag.