Laserfiche WebLink
Complete Scaffold Quote <br />From: scott(arsmetalworks,com (R.S. Metalworks) <br />To: Steve Snoberger <br />Cc: Aimee Long <br />Subject: RE: Budget Estimate for Inspection Scaffold <br />Date: Wednesday, October 21, 2015 3:58.06 PM <br />Steve, <br />Re: Wabasso Causway Scaffold <br />We have reviewed the drawings and materials list for the bridge inspection scaffold and are <br />submitting our price for fabrication of this assembly below. <br />Fabricate (1) rolling square tubing scaffold assembly complete w/slide frame, casters and <br />quick release pins. <br />Total materials and fabrication $4,903.00 <br />Sandblast and epoxy paint $1,275.00 <br />Sales tax $432.46 <br />TotaO $6,610.46 <br />FOB Carter Associates Inc. 1801 27th street Vero Beach <br />Please feel free to contact me with any questions or comments. <br />Thanks for the opportunity, Scott <br />Page 12 of 14 <br />