r <br />OCT 3 11985 <br />BOOK 62 wr`614 <br />Both safety and convenience are less on unpaved than on paved <br />roadways. With the establishment of higher traffic volumes <br />through approval of high intensity residential or non- <br />residential development projects, the County assumes a respon- <br />sibility to enhance safety and facilitate convenience for the <br />general public. Mandating road paving in such cases increases <br />both safety and convenience. <br />One final factor necessitating road paving is the prospect for <br />future paving. As more development is approved on an unpaved <br />road, more entities become involved, and the prospects for a <br />voluntary effort to effect paving decrease. Of course, <br />complaints to the County continue from the general public who <br />use the road to get to the businesses located on it. Since <br />the public will use unpaved roads to access businesses located <br />on such roads and approved by the County, the principal <br />question becomes whether or not the County, in approving the <br />business, also assumes the responsibility to assure the <br />public's health, safety, and convenience, as well as to <br />control its own cost. <br />° Responsibility <br />The issue of responsibility for paving involves several <br />questions and may vary significantly depending upon the <br />circumstances. Given the necessity to pave an unpaved road- <br />way, the responsibility issue must be addressed and resolved. <br />Basically, this issue relates to identification of the indivi- <br />dual, group, or entity required to make specific infra- <br />structure improvements. <br />With road paving, as with the extension of water and sewer <br />lines, responsibility for making improvements to major system <br />components, whether arterial or collector roadways or major - <br />water distribution or wastewater collection lines, is usually + <br />shared between the developer and the County. Regarding road <br />paving, however, other questions arise. On local roads <br />abutting a project but not used for access, developers often <br />have no incentive to pave. However, if paving or contributing <br />toward paving is not required of the developer, the County may <br />absorb the paving costs in the future. <br />Another aspect of responsibility is timing. When the paving <br />should occur must be related to the impact produced by the <br />project. Approval of a project on an unpaved road creates <br />more traffic when the project becomes operational. Paving to <br />provide access must be accomplished prior to issuance of a <br />certificate of occupancy to maintain the relationship between <br />the impact and the improvement. Other required paving which <br />affects roadways or portions of roadways not used for primary <br />access may be paved later. <br />° Fairness/Equity <br />Closely related to road paving responsibility is the issue of <br />fairness or equity. This .issue may soon be resolved for <br />arterial and collector roads, the roadways on the County's <br />adopted' Thoroughfare Plan. These roads will be paved using <br />impact fee funds. This method ensures fairness by funding <br />those improvements necessitated by new development from fees <br />paid by new development. Local roads, however, are not <br />eligible for impact fee funding, a situation that makes <br />fairness/equity remain an issue for most required road paving. <br />The basic factor involving the fairness/equity issue as it <br />pertains to road paving is the benefit derived from the paving <br />versus costs assessed to the beneficiaries. Although all <br />28 <br />