My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/27/1985
CBCC
>
Meetings
>
1980's
>
1985
>
11/27/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:32 AM
Creation date
6/12/2015 11:17:05 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/27/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. West County Regional Wastewater Treatment Plant,_ Utilities <br />Project U85 -S2, Change Order 1 <br />The Board reviewed the following memo dated 11/20/85: <br />TO: THE HONORABLE BOARD OF DATE: NOVEMBER 20, 1985 <br />COUNTY COMMISSIONERS <br />THRU: TERRANCE G. PINTO SUBJECT: WEST COUNTY REGIONAL <br />WASTEWATER TREATMENT <br />PLANT - MAROLF SHOP <br />DRAWING APPROVAL - CHANGE <br />ORDER NO. 1 - COUNTY <br />UTILITIES PROJECT <br />FROM: RONALD R. BROOKS/�� NO. U85 S2 <br />DESCRIPTION AND CONDITIONS <br />Marolf's final shop drawings of the West County Regional Waste- <br />water Treatment Plant were reviewed by Staff for approval for <br />construction. The drawings were acceptable with the exception of <br />several changes that are needed to improve the operation and <br />safety of the facility. The attached change order (No. 1) will <br />provide the needed changes in the facility at an increased cost <br />of $15,972.00 above the original cost of $1,374,600.00. The <br />total cost of the facility with the approval of this change order <br />will -be $1,390,572.00. This change order will not change the <br />contract construction time. <br />RECOMMENDATION <br />Staff recommends that the Honorable Board of County Commissioners <br />approve the attached Change Order No. 1, Project U85 -S2 in the <br />amount of $15,972.00. <br />�A, IOV 2 7 1985 <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Wodtke, the Board unanimously approved <br />Change Order No. 1, Project U85 -S2 in the amount of <br />$15,972, as recommended by Utilities Director Pinto. <br />6 <br />BOOK 6.2 PAGE 827 <br />
The URL can be used to link to this page
Your browser does not support the video tag.