My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-050
CBCC
>
Resolutions
>
1990'S
>
1998
>
1998-050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 9:13:25 PM
Creation date
1/5/2016 3:30:27 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1998-050
Approved Date
04/28/1998
Resolution Type
Authorizing joint participation traffic signal installation
Entity Name
Vista Royale Boulevard and US 1
Department of Transportation
Subject
median revisings on US 1 at 1st St/Spring Lake Drive and Pine Arbor Lane
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHEREAS,the DEPARTMENT is prepared to contribute funds toward improvements <br /> consisting of. Construction of a fully actuated traffic signal with a pole/mastarm type traffic <br /> signal support system and associated hardware to be fully integrated into the Indian River County <br /> Traffic Signal System at the intersection of State Road 5(U.S. 1)and Vista Royale Boulevard <br /> (MP 2.982).The channelization of the median openings at lct Street/Spring Lake Drive <br /> (MP 3.314)and Pine Arbor Lane(MP 2.583).These median openings are consistent with <br /> Conceptual Master Plans,W.P.I.No.4115433,State Project No.88010-1501.These <br /> improvements are in Indian River County and are hereinafter referred to as the PROJECT;and, <br /> WHEREAS,the DEPARTMENT will issue a traffic signal permit,based on approved design <br /> plans,to the COUNTY for installation,by the COUNTY,of a traffic signal at the intersection of <br /> State Road 5(U.S. 1)at Vista Royale Boulevard(MP 2.982);and, <br /> WHEREAS,the DEPARTMENT will issue a roadway alteration permit,based on approved <br /> design plans,to the COUNTY for the channelization of the median openings on U.S. 1 at 1 st <br /> Street/Spring Lake Drive(MP 3.314)and Pine Arbor Lane(2.583);and, <br /> WHEREAS,the COUNTY shall be responsible for all costs associated with the installation and <br /> inspection of the traffic signal,and shall coordinate all DEPARTMENT and Indian River County <br /> inspections;and, <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.