Laserfiche WebLink
CHERRYWOOD ESTATES WATER SERVICES <br /> INDIAN RIVER COUNTY PROJECT#UW-98-05-DS <br /> ESTIMATED CONSTRUCTION COST <br /> CONSTRUCTION ITEMS QUANTIT UNIT UNIT SUBTOTAL <br /> PRICE <br /> c$) cs) <br /> MOBILIZATION,INSURANCE 1 L.S 3,000.00 3,000.00 <br /> VIDEO RECORD 1 L.S 700.00 700.00 <br /> 12"X8"WET TAP W/VALVE 1 L.S 2,500.00 2,500.00 <br /> 8"GATE VALVE 1 L.S 800.00 800.00 <br /> LINE EXTENTION 380 L.F 11.25 4,050.00 <br /> 8" PVC WM 1,280 L.F 10.00 12,8W.00 <br /> 8"DIP WM 80 L.F 18.00 1,440.00 <br /> ADD COST FOR FLANGE,RESTRAINERS/M.J 1 L.$ 1,000.00 1,000.00 <br /> AIR RELEASE VALVE 1 UNIT 200.00 200.00 <br /> FHA 1 UNIT 1,800.00 1,800.00 <br /> 1"SINGLE SHORT SERVICES 10 UNIT 400.00 4,000.00 <br /> 1"SINGLE LONG SERVICES 5 UNIT 500.00 2,500.00 <br /> 1.5"DOUBLE LONG SERVICES 2 UNIT 700.00 1,400.00 <br /> 2"SINGLE LONG SERVICES 2 UNIT 800.00 1,800.00 <br /> 2"BLOW OFF 1 UNIT 200.00 200.00 <br /> DRIVEWAYS BORING 140 L.F 20.00 2,800.00 <br /> ASPHALT ROAD BORING 35 L.F 20.00 700.00 <br /> T WIDE SODDING 1,300 L.F 2.50 3,250.00 <br /> ACAD/GPS AS-BUILT 1 L.S 4,500.00 4,500.00 <br /> SUBTOTAL $ 49,240.00 <br /> 10%CONTINGENCY $ 4,900.00 <br /> ESTIMATED CONSTRUCTION COST $ 54,140.00 <br /> PERMIT 1 L.S 500.00 500.00 <br /> ACAD DRAWING 1 L.$ 1,000.00 1,000.00 <br /> ENGINEERING 150 HRS 30.00 4,500.00 <br /> ADMINISTRATIVE EXPENSES 1 L.S 2,700.00 2,700.00 <br /> TOTAL ESTIMATED PROJECT COST $ 82,840.00 <br /> TOTAL ASSESSIBLE AREA(SOFT) 502,593 <br /> ESTIMATED COST PER SOFT $0.12503159 <br />