My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-083
CBCC
>
Resolutions
>
1990'S
>
1998
>
1998-083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 9:31:14 PM
Creation date
1/7/2016 4:04:21 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1998-083
Approved Date
08/18/1998
Resolution Type
Time and Place
Entity Name
Cherrywood Estates
Subject
water main extension
Area
59th Avenue South of 33rd Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHERRYWOOD ESTATES WATER SERVICES <br /> INDIAN RIVER COUNTY PROJECT#UW-98-05-DS <br /> ESTIMATED CONSTRUCTION COST <br /> CONSTRUCTION ITEMS QUANTIT UNIT UNIT SUBTOTAL <br /> PRICE <br /> c$) cs) <br /> MOBILIZATION,INSURANCE 1 L.S 3,000.00 3,000.00 <br /> VIDEO RECORD 1 L.S 700.00 700.00 <br /> 12"X8"WET TAP W/VALVE 1 L.S 2,500.00 2,500.00 <br /> 8"GATE VALVE 1 L.S 800.00 800.00 <br /> LINE EXTENTION 380 L.F 11.25 4,050.00 <br /> 8" PVC WM 1,280 L.F 10.00 12,8W.00 <br /> 8"DIP WM 80 L.F 18.00 1,440.00 <br /> ADD COST FOR FLANGE,RESTRAINERS/M.J 1 L.$ 1,000.00 1,000.00 <br /> AIR RELEASE VALVE 1 UNIT 200.00 200.00 <br /> FHA 1 UNIT 1,800.00 1,800.00 <br /> 1"SINGLE SHORT SERVICES 10 UNIT 400.00 4,000.00 <br /> 1"SINGLE LONG SERVICES 5 UNIT 500.00 2,500.00 <br /> 1.5"DOUBLE LONG SERVICES 2 UNIT 700.00 1,400.00 <br /> 2"SINGLE LONG SERVICES 2 UNIT 800.00 1,800.00 <br /> 2"BLOW OFF 1 UNIT 200.00 200.00 <br /> DRIVEWAYS BORING 140 L.F 20.00 2,800.00 <br /> ASPHALT ROAD BORING 35 L.F 20.00 700.00 <br /> T WIDE SODDING 1,300 L.F 2.50 3,250.00 <br /> ACAD/GPS AS-BUILT 1 L.S 4,500.00 4,500.00 <br /> SUBTOTAL $ 49,240.00 <br /> 10%CONTINGENCY $ 4,900.00 <br /> ESTIMATED CONSTRUCTION COST $ 54,140.00 <br /> PERMIT 1 L.S 500.00 500.00 <br /> ACAD DRAWING 1 L.$ 1,000.00 1,000.00 <br /> ENGINEERING 150 HRS 30.00 4,500.00 <br /> ADMINISTRATIVE EXPENSES 1 L.S 2,700.00 2,700.00 <br /> TOTAL ESTIMATED PROJECT COST $ 82,840.00 <br /> TOTAL ASSESSIBLE AREA(SOFT) 502,593 <br /> ESTIMATED COST PER SOFT $0.12503159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.