Laserfiche WebLink
Director Pinto explained that if they have to build a <br />treatment plant, they must go through franchising which would <br />allow them to build the treatment plant in modules. <br />Mr. Moler didn't think it would be practical to have a <br />treatment plant for just 5000 gallons. <br />Director Pinto pointed out that there are not 16 actual <br />septic tanks, it is a big septic tank with a gravity line routing - <br />system to pump 5000 gallons of sewage from 16 units to a lift <br />station. <br />ON MOTION by Commissioner Wodtke, SECONDED by <br />Commissioner Lyons, the Board unanimously granted <br />conceptual PRD special exception approval to the Vero <br />South project, subject to the conditions set out in the <br />above staff recommendation, with the addition of two <br />further conditions: 1) that the owners and developers <br />will immediately seek an opportunity to tie <br />in with GDU, and 2) that the County will review within <br />18 months of preliminary PRD approval, the requirements <br />for wastewater treatment, and reserves the right to <br />require necessary changes which may include a system to <br />meet County requirements. <br />Commissioner Lyons left the meeting at 12:45 o'clock P.M. to <br />attend another meeting. <br />REQUEST FROM VOLUNTEER AMBULANCE SQUAD FOR SURCHARGE MONIES FOR <br />EMERGENCY MEDICAL SERVICES <br />The Board reviewed the following letter and memo dated <br />1/9/86 and 10/14/85, respectively: <br />68 <br />JAN 2 2 1986 0 BOOK 63 396 <br />