My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/22/1986 (2)
CBCC
>
Meetings
>
1980's
>
1986
>
1/22/1986 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:00 AM
Creation date
6/12/2015 11:27:08 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
01/22/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAN 2 2 1986 Boa 63 �°,c 440 <br />a. Any person commencing land <br />development activity generating traffic which <br />increases demand chooses to have the fee <br />determined by the individual assessment; <br />b. the proposed land development <br />activity requires a Development of Regional <br />Impact or building permit and the County <br />Administrator or his designee determines the <br />nature, timing or location of the proposed <br />development make it likely to generate impacts <br />costing substantially more to accomodate than <br />the amount of the fee that would be generated <br />by the use of the fee schedule; or <br />C. the proposed land development <br />activi.ty generating traffic which increases <br />demand on the County's major road network <br />system changes or intensifies the use of <br />existing land development. <br />(2) The individual assessment shall be undertaken <br />through the submission of a Traffic Impact Analysis, which shall <br />include the following information: <br />a. The projected trip generation rates <br />for the proposed land development activity, <br />and if applicable pursuant to Section <br />V.C.(1)(c), the existing land development <br />activity. Trip generation rates shall be <br />assessed on an average annual basis, and on a <br />peak design hour basis. The trip generation <br />rates shall be based upon local empirical <br />surveys of trip generation rates for the same <br />or similar land use types that meet <br />methodological standards acceptable to the <br />transporation engineering profession. If <br />local empirical surveys are not available, <br />
The URL can be used to link to this page
Your browser does not support the video tag.