<br /> ARTICLE 13 -TESTS AND INSPECTIONS; furnish ENGINEER the required certificates of inspec-
<br /> CORRECTION, REMOVAL OR ACCEPTANCE OF tion or approval.
<br /> DEFECTIVE WORK
<br /> D. CONTRACTOR shall be responsible for
<br /> arranging and obtaining and shall pay all costs in
<br /> 13.01 Notice of Defects connection with any inspections, tests, or approvals
<br /> required for OWNER's and ENGINEER's acceptance
<br /> A. Prompt notice of all defective Work of which of materials or equipment to be incorporated in the
<br /> OWNER or ENGINEER has actual knowledge will be Work; or acceptance of materials, mix designs, or
<br /> given to CONTRACTOR. All defective Work may be equipment submitted for approval prior to
<br /> rejected, corrected, or accepted as provided in this CONTRACTOR's purchase thereof for incorporation
<br /> Article 13. in the Work. Such inspections, tests, or approvals
<br /> shall be performed by organizations acceptable to
<br /> 13.02 Access to Work OWNER and ENGINEER.
<br /> A. OWNER, ENGINEER, ENGINEER's Con- E. If any Work (or the work of others) that is to
<br /> sultants, other representatives and personnel of be inspected, tested, or approved is covered by CON-
<br /> OWNER, independent testing laboratories, and TRACTOR without written concurrence of ENGI-
<br /> governmental agencies with jurisdictional interests will NEER, it must, if requested by ENGINEER, be uncov-
<br /> have access to the Site and the Work at reasonable ered for observation.
<br /> times for their observation, inspecting, and testing.
<br /> CONTRACTOR shall provide them proper and safe F. Uncovering Work as provided in paragraph
<br /> conditions for such access and advise them of 13,03,E shall be at CONTRACTOR's expense unless
<br /> CONTRACTOR's Site safety procedures and CONTRACTOR has given ENGINEER timely notice
<br /> programs so that they may comply therewith as of CONTRACTOR's intention to cover the same and
<br /> applicable. ENGINEER has not acted with reasonable prompt-
<br /> ness in response to such notice.
<br /> 13.03 Tests and Inspections
<br /> 13.04 Uncovering Work
<br /> A. CONTRACTOR shall give ENGINEER timely
<br /> notice of readiness of the Work for all required A. If any Work is covered contrary to the written
<br /> inspections, tests, or approvals and shall cooperate request of ENGINEER, it must, if requested by ENGI-
<br /> with inspection and testing personnel to facilitate NEER, be uncovered for ENGINEER's observation
<br /> required inspections or tests. and replaced at CONTRACTOR's expense,
<br /> B. OWNER shall emnln►► and na.►_ f 1%01� B. If ENGINEER considers it necessary or
<br /> advisable that covered Work be observed by ENGI-
<br /> narf^rm all lnsn� f te�tg� or nnnFeyalc_real ihm- _h.► NEER or inspected or tested by others, CONTRAC-
<br /> the Genqtr e ep TOR, at ENGINEER's request, shall uncover, expose,
<br /> or otherwise make available for observation, inspec-
<br /> 1. t�strr,—terl: appFGyaltion, or testing as ENGINEER may require, that
<br /> Goyerdrl h►► nnrnarnnhs 13.03.r and 13.03.D portion of the Work in question, furnishing all neces-
<br /> sary labor, material, and equipment. If it is found that
<br /> such Work is defective, CONTRACTOR shall pay all
<br /> i. that r+^StS inri erred in Gennar+tinn__►A►69 69th Claims, costs, losses, and damages (including but not
<br /> limited to all fees and charges of engineers, architects,
<br /> nnrnnrnnh 12 nA R -Qhnll ho nnirl PQ nrn►►irlarl *n attorneys, and other professionals and all court or
<br /> %QPirl n-. h 13.04 and arbitration or other dispute resolution costs)arising out
<br /> of or relating to such uncovering, exposure, observa-
<br /> '�� ncnihan�►�A Rnor+ifir+Pll►► nrn�►irl�r� �n tion, inspection, and testing, and of satisfactory
<br /> the trant nr,r►i imonts, replacement or reconstruction (including but not
<br /> limited to all costs of repair or replacement of work of
<br /> C. If Laws or Regulations of any public body others}; and OWNER shall be entitled to an
<br /> having jurisdiction require any Work (or part thereof) appropriate decrease in the Contract Price. if the
<br /> specifically to be inspected, tested, or approved by an parties are unable to agree as to the amount thereof,
<br /> employee or other representative of such public body, OWNER may make a Claim therefor as provided in
<br /> CONTRACTOR shall assume full responsibility for paragraph 10.05. If, however, such Work is not found
<br /> arranging and obtaining such inspections, tests, or to be defective, CONTRACTOR shall be allowed an
<br /> approvals, pay all costs in connection therewith, and increase in the Contract Price or an extension of the
<br /> 00700_General Conditions REV 04-07.doe
<br /> 00700-35
<br /> FAP ublic Works\E N G I N E E R I N G DIVISION PRGJECTS\121O-Sandridge Driving Range Tee RenovationlAdmimlbid documents100700-General Conditions REV 04-07.doc
<br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:10-OfficialDocuments:9069,Attachment Id 1,Page 102
<br />
|