My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-124A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-124A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 8:26:01 PM
Creation date
1/11/2016 9:47:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/03/2012
Control Number
2012-124A
Agenda Item Number
8.Q
Entity Name
Ag-Scape Services
Subject
Sandridge Golf Course Driving Range
Tee Renovations Contract
Area
Sandridge Golf Course
Project Number
1210
Bid Number
2012040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE <br /> GENERAL CONDITIONS <br /> SC-1.00 Introduction <br /> These Supplementary Conditions amend or supplement the Standard General Conditions of the <br /> Construction Contract (No. 1910--8, 1995 Edition) and other provisions of the Contract <br /> Documents as indicated below. All provisions, which are not so amended or supplemented, <br /> remain in full force and effect. <br /> The terms used in these Supplementary Conditions will have the meanings indicated in the <br /> General Conditions. <br /> SC-1.01 Defined Terms <br /> SC-1.01.A.20. Delete paragraph GC 1.01.A.20 in its entirely. <br /> SC-1.02 Terminology <br /> SC-1.02.D.1, 2, and 3 Delete paragraphs GC-1.02.D.1, 2, and 3 in their entirety and <br /> insert the following paragraphs in their place: <br /> D. Furnish, Install, Perform, Provide <br /> I. The word "furnish" shall mean to supply and deliver services, materials, or <br /> equipment to the Site (or some other specified location) ready for use or <br /> installation and in usable or operable condition. <br /> 2. The word "install" shall mean to put into use or place in final position services, <br /> materials, or equipment complete and ready for intended use. <br /> 3. The words "perform" or "provide" shall mean to furnish and install services, <br /> materials, or equipment complete and ready for intended use. <br /> SC-2.05 Before Starting Construction <br /> SC-2.05.C. Delete paragraph GC 2.05.0 in its entirety and insert the following paragraph in its <br /> place: <br /> C. Evidence of Insurance: CONTRACTOR shall not commence work under this <br /> Contract until he has obtained all insurance required under Article 5 and such <br /> insurance has been delivered to the OWNER and approved by the OWNER, nor <br /> shall the CONTRACTOR allow any Subcontractor to commence work on his <br /> subcontract until all similar insurance required of the Subcontractor has been so <br /> obtained and approved. All such insurance shall remain in effect until final <br /> payment and at all times thereafter when CONTRACTOR may be correcting, <br /> removing or replacing defective Work in accordance with Article 13. <br /> SC-2.05 Preconstruction Conference <br /> SC-2.05 Delete paragraph GC-2.06.A in its entirety and insert the following paragraph in its <br /> place.- <br /> A. Immediately after awarding the contract, but before the CONTRACTOR begins <br /> work, the Construction Coordination Manager will call a preconstruction <br /> conference at a place the ENGINEER designates to establish an understanding <br /> among the parties as to the work and to discuss schedules referred to in <br /> 00800-1 <br /> 00800-Supplementary Conditions 06-09 rev.doc <br /> 00800'l F: ublic WerkslENGINEERING DIVISION PROJECTSkl210-Sandridge Driving Range Tee Renovation\Admimlbid documentsl00800- <br /> Supplementary Conditions <br /> SmeadSoft Reprint Date:Monday,J ud �jl23 �-09:22:12-OfficialDocuments:9069,Attachment Id 1,Page 112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.