Laserfiche WebLink
1.5 PROJECT PHOTOGRAPHS/VIDEOS <br /> The CONTRACTOR shall make provisions, at his expense, for photographs and <br /> A. . <br /> video tapes of all work areas just prior to construction, and for unusual conditions <br /> p physical <br /> duringconstruction. The photographs and videos shall show pertinent phys <br /> • <br /> features along the line of construction. The purpose of the videos is to determine <br /> any damage to private or public property during construction. <br /> B. Pre-Construction Photographs and Video: <br /> 1. Contractor shall provide the owner with photographs and video record and one <br /> co of the existing conditions prior to construction. These photographs and <br /> copy g <br /> videos shall be a standard DVD format and shall be narrated. <br /> 2. Thehoto ra hs and video shall include, but not be limited to, the following <br /> p g p <br /> items shown in a clear manner: <br /> 1} All existing features within the right-of-way. <br /> } <br /> All existingfeatures within the temporary construction easement. <br /> 3} All existing features within permanent easements. <br /> 4 All existing features adjacent to any construction. <br /> 3. Detail of thehoto ra hs and video shall be such that the following examples <br /> p g p <br /> shall be clear and visible: <br /> 'l} Cracks in walls. <br /> 2} Condition of fencing. <br /> 3} Condition of planted areas and types of vegetation. <br /> 4} Condition of sodded areas. <br /> 5 Conditions of sprinkler systems and associated controls and wiring. <br /> } p <br /> 6} Condition of signs. <br /> 7} Conditions of lighting and associated wiring. <br /> S} Significant nificant detail of any pre-existing damages physical features shall be shown. The coverage of the photographs and video should include the <br /> limits of effects of the use of vibratory rollers. <br /> g} photographs These and video record shall be presented and approved <br /> by the Owner prior to the Notice to Proceed. A copy shall be kept in the <br /> Contractor's field office. <br /> 10}Payment— No additional payment will be made for this work. <br /> Y <br /> + + END OF SECTION + + <br /> 01215-2 01215 General Quality Control <br /> FAP ublic Works\ENGINEERING DIVISION PROJECTS\121 o-Sandridge Driving Range Tee RenovationlAdmimlbid <br /> SmeadSoft Reprint Date:Monday,J t� 1, 6�X9 2 5'-99i99 c4e(ntU:W�9,Agtaa&ent Id 1,Page 133 <br />