Laserfiche WebLink
G. It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed, <br /> destroyed, or damaged during construction. Particular attention will be <br /> placed on restoration of canals to equal or better condition than prior to <br /> construction. <br /> H. When finished surfaces require cleaning with cleaning materials, use only <br /> those cleaning materials which will not create hazards to health or <br /> property and which will not damage the surfaces. Use cleaning materials <br /> only on those surfaces recommended by the manufacturer. Follow the <br /> manufacturer's directions and recommendations at all times. <br /> I. Keep the amount of dust produced during construction activities to a <br /> minimum. At CONTRACTOR's expense, spray water or other dust control <br /> agents over the areas, which are producing the dust. Schedule <br /> construction operations so that dust and other contaminants will not fall on <br /> wet or newly coated surfaces. <br /> 1.3 SITE CLEANUP AND RESTORATION <br /> Prior to final completion, the OWNER, ENGINEER, INDIAN RIVER FARMS <br /> WATER CONTROL DISTRICT, and CONTRACTOR shall review the site with <br /> regards to site cleanup and restoration. Clean and/or restore all items <br /> determined to be unsatisfactory by the OWNER or ENGINEER, at no additional <br /> expense, <br /> + + END OF SECTION + + <br /> 01710 Site Cleanup <br /> 01710-2 <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS11210-Sandridge Driving Range Tee Renovation\Admimlbid documents101710-Site <br /> Cleanup.doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:21-OfficialDocuments:9069,Attachment Id 1,Page 158 <br />