Laserfiche WebLink
event. Clean and maintain each pollution control system as required by its <br /> manufacturer or the OWNER, until the system is no longer needed. If a water <br /> quality violation occurs, immediately cease all work contributing to the water quality <br /> violation and correct the problem. <br /> E. Discharge shall not violate State or local water quality standards in the receiving <br /> waters, nor cause injury to the public health or to public or private property, nor to <br /> the Work completed or in progress. The receiving point for water from construction <br /> operations shall be approved by the applicable owner, regulatory agency, and the <br /> ENGINEER. <br /> F. Promptly repair all damage at no cost to the OWNER. <br /> 1.4 SUBMITTALS <br /> A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment <br /> systems in accordance with Section 1340. <br /> B. Stormwater Pollution Prevention Plan. <br /> 1.5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br /> REQUIRED FOR INSTALLATION, AND MAINTENANCE <br /> A. State Certified Erosion Control Specialty Subcontractor is Re uired for Installation <br /> and Maintenance: Installation and maintenance of all erosion and stormwater <br /> pollution control devices, shall be by a State Certified erosion control subcontractor <br /> who specializes in the installation and maintenance of such devices. After <br /> installation, this specialty subcontractor shall maintain the erosion and stormwater <br /> pollution control devices until in the ENGINEER's sole opinion, the devices are no <br /> longer necessary (such time not to extend past the date the OWNER formally <br /> accepts the project as complete). Before beginning construction, submit to Indian <br /> River County for review and approval, a Stormwater Pollution Prevention Plan <br /> (SWPPP), prepared by the certified erosion control subcontractor. Construction <br /> shall not begin until the SWPPP has been approved by Indian River County. <br /> Submit the approved SWPPP to the ENGINEER before beginning construction. <br /> Include in the SWPPP, the "Contractor's Affidavit Regarding Erosion Control and <br /> Treatment of Dewatering Water and Stormwater From the Construction Site" <br /> (located at the end of this Section). <br /> 1.0 "POLLUTION" AND CERTAIN UNCONTESTABLE POLLUTION EVENTS <br /> DEFINED <br /> A. With respect to this Section and as may be further defined in paragraphs 1.0,8, <br /> 1.5.C, and 1.0.D, "pollution" is the presence in off-site waters of any substances, <br /> contaminants, or manmade or human-induced impairment of off-site waters or <br /> alteration of the chemical, physical, biological, or radiological integrity of off-site <br /> water in quantities or at levels which are or may be potentially harmful or injurious to <br /> 01025-4 Technical Specifications <br /> FAP ublic Works\ENGINEERING DIVISION PROJECTS\121 O-Sandrid ge Driving Range Tee RenovationlAdmimlbid <br /> documents\Technicai Specifications.doc. <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:22-OfficialDocuments:9069,Attachment Id 1,Page 164 <br />