Laserfiche WebLink
site or work area. Provide wash-down stations as required to wash vehicle tires and <br /> retain all washwater on-site. Do not use limerock. <br /> H. Rock and Stone for Erosion Control and Pollution Control and Treatment: <br /> 1. Crushed Limerock: Crushed limerock shall not be used under any <br /> circumstance. <br /> 2. Acceptable Material: FDOT#4 non-calcareous aggregate (usually granite), <br /> washed and meeting the requirements of FDOT Standard Specifications for <br /> Road and Bridge Construction, Section got. <br /> 1, ,Hay Bales: Hay bales shall not be used. <br /> PART 3 - EXECUTION <br /> A. Design, construct, and maintain the pollution control and treatment system to <br /> minimize erosion and capture and remove pollutants from the construction site and <br /> from all other areas disturbed by construction activities. <br /> B. Apply polyacrylamide only as directed by the polyacrylamide manufacturer/supplier. <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No. 104-1 — Erosion & Water Pollution Control -- Lump Sum <br /> [The remainder of this page was left blank intentionally] <br /> 01025-8 Technical Specifications <br /> FAP ublic Works\ENGINEERING DIVIS10N PRGJECTSI121O-Sandridge Driving Range Tee RenovationlAdmimlbid <br /> documents\Technical Specifications.doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:23-OfficialDocuments:9069,Attachment Id 1,Page 168 <br />