Laserfiche WebLink
AND <br /> Field measurements of vertical or horizontal dimensions of constructed <br /> improvements shall be obtained so that the constructed facility can be delineated <br /> in such a way that the location of the construction may be compared with the <br /> construction plans. Clearly shows by symbols, notations, or delineations, those <br /> constructed improvements located by the survey. <br /> 1. Right-of-way Swale/Drainage --- All culvert inverts, elevations and station <br /> offsets; inlet grate and bottom elevations; swale beginning and end bottom <br /> elevations; and highs and lows along top of bank. Size of swale. <br /> 2. Pipe Culvert/PVC Sleeves —All inverts, stations and offsets. <br /> 3. Outfalls --All pipe inverts, elevations and station offsets, weir box elevations, <br /> weir elevation, and sizes. <br /> 4. Roadway/Off Site Drainage — All inverts, elevations and station offsets; <br /> manhole top elevation; grate top elevations. <br /> 5. Retention Ponds— Perimeter elevations, grade breaks, depths, and calculate <br /> pond area at control elevation and grade breaks above water surface. <br /> 6. Roadway: <br /> a. Stations and offset related to controlling baseline and elevations of all <br /> structures, side street and major driveway radius returns (edge of <br /> pavement), bends and/or change in direction of roadway alignment, OR <br /> minimum at 1000' intervals along roadway alignment. <br /> b. Elevations along Profile Grade Line(PGL), of all edge of pavements either <br /> side of Profile Grade Line (PGL), at medians at the high/low and PVI <br /> points along Profile Grade Line (PGL). <br /> c. All final Elevations to be plotted on PGL AND Plan -- Profile sheets as <br /> applicable. <br /> d. Elevations of edge of pavement and flow line at curb inlets and on the <br /> adjacent edge of pavement at curb inlets. <br /> SURVEY CONTROL <br /> 1. Install/re-establish: It shall be the contractor's responsibility to hire a <br /> Professional Surveyor and Mapper as defined per Chapter 472, Florida <br /> Statutes, to replace any horizontal and vertical control shown on the <br /> engineering plans that was destroyed during construction. <br /> 2. New roadway alignment control points (Survey Baseline or controlling line and all <br /> points as indicated on the plans or control sheet) upon final roadway completion. <br /> Include all intersections and side streets. State Plane Coordinates and <br /> elevations for all control points. <br /> 3. Either if shown on plans or not: Any Public Land Corner or Governmental <br /> Survey Control points),vertical control (bench marks), property corners <br /> destroyed and/or disturbed during the scope of the project shall be properly re- <br /> established as per standards as set forth within Florida Statutes,Administrative <br /> code and Minimum Technical Standards for that type of survey. All said <br /> 01025-12 Technical Specifications <br /> F:1Public Works\ENGINEERING DIVISION PROJECTSl1210-Sandridge Driving Range Tee Renovation\Admimlbid <br /> documents\Technical Specifications,doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:23-OfficialDocuments:9069,Attachment Id 1,Page 172 <br />