Laserfiche WebLink
❑ (a) Obtained field measurements of vertical or horizontal dimensions of constructed <br /> improvements so that the constructed facility can be delineated in such a way that the <br /> location of the construction may be compared with the construction plans. <br /> ❑ (b) Clearly shows by symbols, notations, or delineations,those constructed improvements <br /> located by the survey. <br /> ❑ (c)All maps prepared shall meet applicable minimum technical standards. <br /> ❑ (d)Vertical and horizontal accuracy of the measurements made shall be such that it may be <br /> determined whether the improvements were constructed consistent with planned locations. <br /> + + END OF SECTION + + <br /> 01025-16 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS11210-Sandridge Driving Range Tee Renovation\Admimlbid documents\Technical <br /> Specifications.doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:24-OfficialDocuments:9069,Attachment Id 1,Page 176 <br />