ARTICLE 7 - INDEMNIFICATION
<br /> 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with
<br /> paragraph 5.20 (Indemnification) of the General Conditions to the Construction Contract,
<br /> ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS
<br /> 8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the
<br /> following representations:
<br /> A. CONTRACTOR has examined and carefully studied the Contract Documents and the
<br /> other related data identified in the Bidding Documents.
<br /> B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the
<br /> general, local, and Site conditions that may affect cost, progress, and performance of the
<br /> Work,
<br /> C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and
<br /> Regulations that may affect cost, progress, and performance of the Work.
<br /> D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of
<br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions
<br /> in or relating to existing surface or subsurface structures at or contiguous to the Site
<br /> (except Underground Facilities) which have been identified in the Supplementary
<br /> Conditions as provided in paragraph 4.02 of the General conditions and (2) reports and
<br /> drawings of a Hazardous Environmental Condition, if any, at the Site which have been
<br /> identified in the Supplementary conditions as provided in paragraph 4.05 of the General
<br /> Conditions,
<br /> E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
<br /> done so) all additional or supplementary examinations, investigations, explorations, tests,
<br /> studies, and data concerning conditions (surface, subsurface, and Underground Facilities)
<br /> at or contiguous to the Site which may affect cost, progress, or performance of the Work
<br /> or which relate to any aspect of the means, methods, techniques, sequences, and
<br /> procedures of construction to be employed by CONTRACTOR, including applying the
<br /> specific means, methods, techniques, sequences, and procedures of construction, if any,
<br /> expressly required by the Contract Documents to be employed by CONTRACTOR, and
<br /> safety precautions and programs incident thereto
<br /> F. CONTRACTOR does not consider that any further examinations, investigations,
<br /> explorations, tests, studies, or data are necessary for the performance of the Work at the
<br /> Contract Price, within the Contract Times, and in accordance with the other terms and
<br /> conditions of the Contract Documents.
<br /> G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and
<br /> others at the Site that relates to the Work as indicated in the Contract Documents,
<br /> H. CONTRACTOR has correlated the information known to CONTRACTOR, information and
<br /> observations obtained from visits to the Site, reports and drawings identified in the
<br /> Contract Documents, and all additional examinations, investigations, explorations, tests,
<br /> studies, and data with the Contract Documents,
<br /> 2012040 Agreement
<br /> 00520-5
<br /> F*\Purohas1ng\Bids12011-2012 FY(2012000)12012040 Sandridge Driving Range Expansionl2012040Agreement.doo
<br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:21:55-OfficialDocuments:9069,Attachment Id 1,Page 46
<br />
|