Laserfiche WebLink
paragraph 10.05. However, OWNER, <br /> B. ENGINEER's Review.- After receipt of written ENGINEER, and ENGINEER's Consultants <br /> notice as required by paragraph 4.03.A, ENGINEER shall not be liable to CONTRACTOR for any <br /> will promptly review the pertinent condition, determine claims, costs, losses, or damages (including <br /> the necessity of OWNER's obtaining additional but not limited to all fees and charges of <br /> exploration or tests with respect thereto, and advise engineers, architects, attorneys, and other <br /> OWNER in writing (with a copy to CONTRACTOR) of professionals and all court or arbitration or other <br /> ENGINEER's findings and conclusions. dispute resolution costs) sustained by <br /> CONTRACTOR on or in connection with any <br /> C. Possible Price and Times Adjustments other project or anticipated project. <br /> 1. The Contract Price or the Contract 4.04 Underground Facilities <br /> Times, or both, will be equitably adjusted to the <br /> extent that the existence of such differing A. Shown or Indicated.The information and data <br /> subsurface or physical: condition causes an in- shown or indicated in the Contract Documents with <br /> crease or decrease in CONTRACTOR's cost respect to existing Underground Facilities at or <br /> of, or time required for, performance of the contiguous to the Site is based on information and <br /> Work; subject, however, to the following: data furnished to OWNER or ENGINEER by the <br /> owners of such Underground Facilities, including <br /> a. such condition must meet any one or OWNER, or by others. Unless it is otherwise <br /> more of the categories described in para- expressly provided in the Supplementary Conditions: <br /> graph 4.03,A; and <br /> 1. OWNER and ENGINEER shall not <br /> b. with respect to Work that is paid for be responsible for the accuracy or com- <br /> on a Unit Price Basis, any adjustment in pleteness of any such information or data; and <br /> Contract Price will be subject to the <br /> provisions of paragraphs 9.08 and 11.03. 2. the cost of all of the following will be <br /> included in the Contract Price, and CONTRAC- <br /> 2. CONTRACTOR shall not be entitled TOR shall have full responsibility for: <br /> to any adjustment in the Contract Price or <br /> Contract Times if: a. reviewing and checking all such <br /> information and data, <br /> a. CONTRACTOR knew of the <br /> existence of such conditions at the time b. locating all Underground Facilities <br /> CONTRACTOR made a final commitment shown or indicated in the Contract <br /> to OWNER in respect of Contract Price and Documents, <br /> Contract Times by the submission of a Bid <br /> or becoming bound under a negotiated c, coordination of the Work with the <br /> contract; or owners of such Underground Facilities, <br /> including OWNER, during construction, and <br /> b. the existence of such condition could <br /> reasonably have been discovered or d, the safety and protection of all such <br /> revealed as a result of any examination, Underground Facilities and repairing any <br /> investigation, exploration, test, or study of damage thereto resulting from the Work. <br /> the Site and contiguous areas required by <br /> the Bidding Requirements or Contract B. Not Shown or Indicated <br /> Documents to be conducted by or for CON- <br /> TRACTOR prior to CONTRACTOR's 1. If an Underground Facility is <br /> making such final commitment; or uncovered or revealed at or contiguous to the <br /> Site which was not shown or indicated, or not <br /> c. CONTRACTOR failed to give the shown or indicated with reasonable accuracy in <br /> written notice within the time and as re- the Contract Documents, CONTRACTOR shall, <br /> quired by paragraph 4.03.A. promptly after becoming aware thereof and <br /> before further disturbing conditions affected <br /> 3. If OWNER and CONTRACTOR are thereby or performing any Work in connection <br /> unable to agree on entitlement to or on the therewith (except in an emergency as required <br /> amount or extent, if any, of any adjustment in by paragraph 6.16.A), identify the owner of <br /> the Contract Price or Contract Times, or both, a such Underground Facility and give written <br /> Claim may be made therefor as provided in notice to that owner and to OWNER and ENGI- <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-12 <br /> F:\Public Works\ENGINEERING DIVISIGN PROJEGTS11210-Sandridge Driving Range Tee Re novation\Admimlbid documents100700-General Conditions REV 04--07.doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:05-OfficialDocuments:9069,Attachment Id 1,Page 79 <br />