My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-124A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-124A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 8:26:01 PM
Creation date
1/11/2016 9:47:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/03/2012
Control Number
2012-124A
Agenda Item Number
8.Q
Entity Name
Ag-Scape Services
Subject
Sandridge Golf Course Driving Range
Tee Renovations Contract
Area
Sandridge Golf Course
Project Number
1210
Bid Number
2012040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEER. ENGINEER will promptly review the B. Limited Reliance by CONTRACTOR on <br /> Underground Facility and determine the extent, Technical Data Authorized. CONTRACTOR may rely <br /> if any, to which a change is required in the upon the general accuracy of the "technical data" <br /> Contract Documents to reflect and document contained in such reports and drawings, but such <br /> the consequences of the existence or location reports and drawings are not Contract Documents. <br /> of the Underground Facility. During such time, Such "technical data" is identified in the <br /> CONTRACTOR shall be responsible for the Supplementary Conditions. Except for such reliance <br /> safety and protection of such Underground on such "technical data," CONTRACTOR may not rely <br /> Facility. upon or make any Claim against OWNER, <br /> ENGINEER or any of ENGI N EER's Consultants with <br /> 2. If ENGINEER concludes that a respect to: <br /> change in the Contract Documents is required, <br /> a Work Change Directive or a Change order 1. the completeness of such reports <br /> will be issued to reflect and document such and drawings for CONTRACTOR's purposes, <br /> consequences. An equitable adjustment shall including, but not limited to, any aspects of the <br /> be made in the Contract Price or Contract means, methods, techniques, sequences and <br /> Times, or both, to the extent that they are procedures of construction to be employed by <br /> attributable to the existence or location of any CONTRACTOR and safety precautions and <br /> Underground Facility that was not shown or programs incident thereto, or <br /> indicated or not shown or indicated with <br /> reasonable accuracy in the Contract 2. other data, interpretations, opinions <br /> Documents and that CONTRACTOR did not and information contained in such reports or <br /> know of and could not reasonably have been shown or indicated in such drawings; or <br /> expected to be aware of or to have anticipated. <br /> If OWNER and CONTRACTOR are unable to 3. any CONTRACTOR interpretation of <br /> agree on entitlement to or on the amount or or conclusion drawn from any "technical data" <br /> extent, if any, of any such adjustment in or any such other data, interpretations, opinions <br /> Contract Price or Contract Times, OWNER or or information. <br /> CONTRACTOR may make a Claim therefor as <br /> provided in paragraph 10.05. C. CONTRACTOR shall not be responsible for <br /> any Hazardous Environmental Condition uncovered or <br /> 4.05 Reference Points revealed at the Site which was not shown or indicated <br /> in Drawings or Specifications or identified in the <br /> A. OWNER shall provide engineering surveys to Contract Documents to be within the scope of the <br /> establish reference points for construction which in Work. CONTRACTOR shall be responsible for a <br /> ENGINEER's judgment are necessary to enable Hazardous Environmental Condition created with any <br /> CONTRACTOR to proceed with the Work. CON- materials brought to the Site by CONTRACTOR, <br /> TRACTOR shall be responsible for laying out the Subcontractors, Suppliers, or anyone else for whom <br /> Work, shall protect and preserve the established CONTRACTOR is responsible. <br /> reference points and property monuments, and shall <br /> make no changes or relocations without the prior D. If CONTRACTOR encounters a Hazardous <br /> written approval of OWNER. CONTRACTOR shall Environmental Condition or if CONTRACTOR or <br /> report to ENGINEER whenever any reference point or anyone for whom CONTRACTOR is responsible <br /> property monument is lost or destroyed or requires creates a Hazardous Environmental Condition, <br /> relocation because of necessary changes in grades or CONTRACTOR shall immediately: (i) secure or <br /> locations, and shall be responsible for the accurate otherwise isolate such condition; (ii) stop all Work in <br /> replacement or relocation of such reference points or connection with such condition and in any area <br /> property monuments by professionally qualified affected thereby (except in an emergency as required <br /> personnel. by paragraph 5.15); and (iii) notify OWNER and ENGI- <br /> NEER (and promptly thereafter confirm such notice in <br /> 4.05 Hazardous Environmental Condition at Site writing). OWNER shall promptly consult with <br /> ENGINEER concerning the necessity for OWNER to <br /> A. Reports and Drawings: Reference is made to retain a qualified expert to evaluate such condition or <br /> the Supplementary Conditions for the identification of take corrective action, if any. <br /> those reports and drawings relating to a Hazardous <br /> Environmental Condition identified at the Site, if any, E. CONTRACTOR shall not be required to <br /> that have been utilized by the ENGINEER in the resume Work in connection with such condition or in <br /> preparation of the Contract Documents. any affected area until after OWNER has obtained <br /> any required permits related thereto and delivered to <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-13 <br /> FAPublic WorksIENGINEERING DIVISION PROJECTS\1210-Sandridge Driving Range Tee Renovation\Admimlbid documents\00700-General Conditions REV 04-07.doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:05-OfficialDocuments:9069,Attachment Id 1,Page 80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.