My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-124A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-124A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 8:26:01 PM
Creation date
1/11/2016 9:47:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/03/2012
Control Number
2012-124A
Agenda Item Number
8.Q
Entity Name
Ag-Scape Services
Subject
Sandridge Golf Course Driving Range
Tee Renovations Contract
Area
Sandridge Golf Course
Project Number
1210
Bid Number
2012040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to show ENGINEER the services, materials, and CONTRACTOR's review and approval of that <br /> equipment CONTRACTOR proposes to provide and submittal. <br /> to enable ENGINEER to review the information for the <br /> limited purposes required by paragraph 6.17.E. 3. At the time of each submittal, CON- <br /> TRACTOR shall give ENGINEER specific <br /> B. CONTRACTOR shall also submit Samples to written notice of such variations, if any, that the <br /> ENGINEER for review and approval in accordance Shop Drawing or Sample submitted may have <br /> with the acceptable schedule of Shop Drawings and from the requirements of the Contract <br /> Sample submittals. Each Sample will be identified Documents, such notice to be in a written com- <br /> clearly as to material, Supplier, pertinent data such as munication separate from the submittal; and, in <br /> catalog numbers, and the use for which intended and addition, shall cause a specific notation to be <br /> otherwise as ENGINEER may require to enable ENGI- made on each Shop Drawing and Sample sub- <br /> NEER to review the submittal for the limited purposes mitted to ENGINEER for review and approval of <br /> required by paragraph 6.17.E. The numbers of each each such variation. <br /> Sample to be submitted will be as specified in the <br /> Specifications. E. ENGINEER's Review <br /> C. Where a Shop Drawing or Sample is required 1. ENGINEER will timely review and <br /> by the Contract Documents or the schedule of Shop approve Shop Drawings and Samples in <br /> Drawings and Sample submittals acceptable to ENGI- accordance with the schedule of Shop <br /> NEER as required by paragraph 2.67, any related Drawings and Sample submittals acceptable to <br /> Work performed prior to ENGINEER's review and ENGINEER. ENGINEER's review and <br /> approval of the pertinent submittal will be at the sole approval will be only to determine if the items <br /> expense and responsibility of CONTRACTOR. covered by the submittals will, after installation <br /> or incorporation in the Work, conform to the <br /> D. Submittal Procedures information given in the Contract Documents <br /> and be compatible with the design concept of <br /> 1. Before submitting each Shop the completed Project as a functioning whole as <br /> Drawing or Sample, CONTRACTOR shall have indicated by the Contract Documents. <br /> determined and verified: <br /> 2. ENGINEER's review and approval <br /> a. all field measurements, quantities, will not extend to means, methods, techniques, <br /> dimensions, specified performance criteria, sequences, or procedures of construction <br /> installation requirements, materials, catalog (except where a particular means, method, <br /> numbers, and similar information with technique, sequence, or procedure of con- <br /> respect thereto; struction is specifically and expressly called for <br /> by the Contract Documents) or to safety <br /> b. all materials with respect to intended precautions or programs incident thereto. The <br /> use, fabrication, shipping, handling, storage, review and approval of a separate item as such <br /> assembly, and installation pertaining to the will not indicate approval of the assembly in <br /> performance of the Work; which the item functions. <br /> C. all information relative to means, 3. ENGINEER's review and approval of <br /> methods, techniques, sequences, and Shop Drawings or Samples shall not relieve <br /> procedures of construction and safety CONTRACTOR from responsibility for any <br /> precautions and programs incident thereto; variation from the requirements of the Contract <br /> and Documents unless CONTRACTOR has in <br /> writing called ENGINEER's attention to each <br /> d. CONTRACTOR shall also have such variation at the time of each submittal as <br /> reviewed and coordinated each Shop required by paragraph 6.17,D.3 and ENGI- <br /> Drawing or Sample with other Shop NEER has given written approval of each such <br /> Drawings and Samples and with the variation by specific written notation thereof <br /> requirements of the Work and the Contract incorporated in or accompanying the Shop <br /> Documents. Drawing or Sample approval; nor will any <br /> approval by ENGINEER relieve COW <br /> . Each submittal shall bear a stamp or TRACTOR from responsibility for complying <br /> specific written indication that CONTRACTOR with the requirements of paragraph 6.17.D.1. <br /> has satisfied CONTRACTOR's obligations <br /> under the Contract Documents with respect to <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-24 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS11210-Sandridge Driving Range Tee Renovation\Admimlbid documents100700-General Conditions REV 04-07.doe <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:09-OfficialDocuments:9069,Attachment Id 1,Page 91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.