Laserfiche WebLink
ARTICLE 8 -OWNER'S RESPONSIBILITIES 8.09 Limitations on OWNER's Responsibilities <br /> A. The OWNER shall not supervise, direct, or <br /> 8.01 Communications to Contractor have control or authority over, nor be responsible for, <br /> CONTRACTOR's means, methods, techniques, se- <br /> A. Except as otherwise provided in these quences, or procedures of construction, or the safety <br /> General Conditions, OWNER shall issue all communi- precautions and programs incident thereto, or for any <br /> cations to CONTRACTOR through ENGINEER. failure of CONTRACTOR to comply with Laws and <br /> Regulations applicable to the performance of the <br /> 8.02 Replacement of ENGINEER Work. OWNER will not be responsible for <br /> CONTRACTOR's failure to perform the Work in <br /> A, In case of termination of the employment of accordance with the Contract Documents, <br /> ENGINEER, OWNER shall appoint an engineer to <br /> whom CONTRACTOR makes no reasonable 8.10 Undisclosed Hazardous Environmental <br /> objection, whose status under the Contract Condition <br /> Documents shall be that of the former ENGINEER. <br /> A. OWNER's responsibility in respect to an <br /> 8.03 Furnish data undisclosed Hazardous Environmental Condition is <br /> set forth in paragraph 4.05. <br /> A. OWNER shall promptly furnish the data <br /> required of OWNER under the Contract Documents. 8.11 Evidence of Financial Arrangements <br /> 8.04 Pay Promptly When Due A. If and to the extent OWNER has agreed to <br /> furnish CONTRACTOR reasonable evidence that <br /> A. OWNER shall make payments to CONTRAC- financial arrangements have been made to satisfy <br /> TOR promptly when they are due as provided in OWNER's obligations under the Contract Documents, <br /> paragraphs 14.02.0 and 14.07.C. OWNER's responsibility in respect thereof will be as <br /> set forth in the Supplementary Conditions, <br /> 8.05 Lands and Easements;Reports and Tests <br /> A. OWNER's duties in respect of providing lands ARTICLE 9 - ENGINEER'S STATUS DURING <br /> and easements and providing engineering surveys to CONSTRUCTION <br /> establish reference points are set forth in paragraphs <br /> 4.01 and 4.05. Paragraph 4.02 refers to OWNER's <br /> identifying and making available to CONTRACTOR 9.01 OWNER'S Representative <br /> copies of reports of explorations and tests of <br /> subsurface conditions and drawings of physical A. ENGINEER will be OWNER's representative <br /> conditions in or relating to existing surface or during the construction period. The duties and <br /> subsurface structures at or contiguous to the Site that responsibilities and the limitations of authority of <br /> have been utilized by ENGINEER in preparing the ENGINEER as OWNER's representative during <br /> Contract Documents, construction are set forth in the Contract Documents <br /> and will not be changed without written consent of <br /> 8.05 Insurance OWNER and ENGINEER. <br /> A. OWNER's responsibilities, if any, in respect to 9.02 Visits to Site <br /> purchasing and maintaining liability and property insur- <br /> ance are set forth in Article 5. A. ENGINEER will make visits to the Site at <br /> intervals appropriate to the various stages of construc- <br /> 8.07 Change Orders tion as ENGINEER deems necessary in order to <br /> observe as an experienced and qualified design <br /> A. OWNER is obligated to execute Change professional the progress that has been made and the <br /> Orders as indicated in paragraph 10.03. quality of the various aspects of CONTRACTOR's <br /> executed Work. Based on information obtained <br /> 8,08 Inspections, Tests, and Approvals during such visits and observations, ENGINEER, for <br /> the benefit of OWNER, will determine, in general, if <br /> A. OWNER's responsibility in respect to certain the Work is proceeding in accordance with the Con- <br /> inspections, tests, and approvals is set forth in tract Documents. ENGINEER will not be required to <br /> paragraph 13.03.6. make exhaustive or continuous inspections on the Site <br /> to check the quality or quantity of the Work. <br /> 00700-General Conditions REV 04-07.doe <br /> 00700-27 <br /> FAPublic Works\E N G I N E ER I N G DIVISION PROJECTSl1210-Sandridge Driving Range Tee Renovation\Admimlbid documents100700-General Conditions REV 04-07.doe <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:09-OfficialDocuments:9069,Attachment Id 1,Page 94 <br />