Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and West Construction, Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows <br />Construction of three (3) new combination Skeet and Trap Ranges east of the <br />existing 5 -stand range, including a Storage Building, Hi/low Trap Houses, associated <br />paving and utilities, and mowing (no fill) of a new Sporting Clays Trail west of the <br />existing Sporting Clays Trail. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows. <br />Project Name: SKEET AND TRAP FACILITY IMPROVEMENTS FOR THE INDIAN <br />RIVER COUNTY PUBLIC SHOOTING RANGE <br />County Project Number: 1213B <br />Bid Number: 2016008 <br />Project Address: 10455 102nd Terrace, Sebastian, Florida 32958-7823 <br />ARTICLE 3 — ENGINEER <br />3 01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 150th calendar day after the <br />date when the Contract Times commence to run as provided in paragraph 2.03 of the <br />00520 - Agreement (Public Works) REV 06-14 <br />00520 - 2 <br />F'\Purchasing\Bids\2015-2016 FY (2016000)\2016008 -Skeet and Trap Facility Improvements for the Indian River County Public Shooting Range\00520 - Agreement (Public <br />Works) REV 06-14.doc <br />