My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-241A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-241A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:04:20 AM
Creation date
1/11/2016 11:38:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-241A
Agenda Item Number
8.L.
Entity Name
West Construction Inc.
Subject
Contrac and Specifications
Skeet and Trap Facility Improvements
Indian River Count Public Shooting Range
Area
Indian River County Public Shooting Range
Project Number
1213B
Bid Number
2016008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00550 - Notice to Proceed <br />TO: <br />Dated <br />(BIDDER) <br />ADDRESS. <br />Contract For: <br />SKEET AND TRAP FACILITY IMPROVEMENTS FOR THE INDIAN RIVER COUNTY <br />PUBLIC SHOOTING RANGE <br />IRC Project No: 1213B <br />IRC Bid No 2016008 <br />You are notified that the Contract Times under the above contract will commence to run on <br />By that date, you are to start performing your obligations under the Contract <br />Documents The contract has allocated 150 calendar days for Substantial Completion of this <br />project and 180 calendar days for Final Completion In accordance with Article 4 of the <br />Agreement the date of Substantial Completion is and the date of readiness for final <br />oavment is - <br />CONTRACTOR shall not commence work under this Contract until he has obtained all <br />insurance required under Article 5 and such insurance has been delivered to the OWNER and <br />approved by the OWNER, nor shall the CONTRACTOR allow any Subcontractor to commence <br />work on his subcontract until all similar insurance required of the Subcontractor has been so <br />obtained and approved. All such insurance shall remain in effect until final payment and at all <br />times thereafter when CONTRACTOR may be correcting, removing or replacing defective Work <br />in accordance with Article 13. <br />Also, before you may start any Work at the Site, you must: <br />(add other requirements, if applicable) <br />INDIAN RIVER COUNTY <br />(OWNER) <br />By: <br />(AUTHORIZED SIGNATURE) <br />(TITLE) <br />00550 - Notice to Proceed REV 1-4-11 <br />00550 - 1 <br />F1Public Works ENGINEERING DIVISION PROJECTS \1213B -IRC Shooting Range Skeet & Trap Phase 21Admin\bid documents\Master Contract Documents\00550 - Notice <br />to Proceed REV 1-4-11.doc Rev 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.