My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-241A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-241A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:04:20 AM
Creation date
1/11/2016 11:38:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-241A
Agenda Item Number
8.L.
Entity Name
West Construction Inc.
Subject
Contrac and Specifications
Skeet and Trap Facility Improvements
Indian River Count Public Shooting Range
Area
Indian River County Public Shooting Range
Project Number
1213B
Bid Number
2016008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. lots or damage to thc completed Pro <br />ject or part thereof caused by, arising out of, or <br />cause of loss covered by any property <br />or part thereof by OWNER during partial <br />utilization pursuant to paragraph 14.05, after <br />14.04, or after final payment pursuant to <br />paragraph 11.07. <br />C. Any insurance policy maintained by OWNER <br />covering any loss, damage or consequential los, <br />referred to in paragraph 5.07.B shall contain <br />any such lo:, damage, or consequential loss, the <br />CONTRACTOR, Subcontractors, ENGINEER, or <br />ENGINEER's Consultants and the officers, directors, <br />5.08 Receipt and Application of Insurance <br />Proceeds <br />A. Any insured Ions under the policies of <br />with OWNER and made payable to OWNER as <br />fiduciary for the insureds, as their interests may <br />other special agreement is reached, the damaged <br />Work shall be repaired or replaced, the moneys so <br />Change Order or Written Amendment. <br />B. OWNER as fiduciary shall have power to <br />days after the occurrence of loss to OWNER's <br />OWNER as fiduciary shall make settlement with the <br />parties in interest may reach. If no such agreement <br />insurers and, if required ih writing by any party in <br />proper performance of such duties. <br />5 09 Acceptance of Bonds and Insurance, Option <br />to Replace <br />A. If either OWNER or CONTRACTOR has any <br />objection to the coverage afforded by or other provi <br />cions of thc Bonds or insurance required to be <br />receipt of the certificates (or other evidence <br />requested) required by paragraph 2.05.C. OWNER <br />provided as the other may reasonably request. If <br />either party docs not purcha <br />Contract Documents, such party shall notify the other <br />any change in the required coverage. Without <br />prejudice to any other right or remedy, the other party <br />protect such other party's interests at the expense of <br />the party who was required to provide such coverage, <br />and a Change Order shall be issued to adjust thc <br />Contract Price accordingly. <br />5 10 Partial Utilization, Acknowledgment of <br />Property Insurer <br />A. If OWNER finds it necessary to occupy or use <br />a portion or portions of the Work prior to Substantial <br />Completion of all the Work as provided in paragraph <br />14.05, no such use or occupancy shall commence <br />before the insurers providing the property insurance <br />pursuant to paragraph 5 06 have acknowledged notice <br />thereof and in writing effected any changes in cover- <br />age necessitated thereby. The insurers providing the <br />property insurance shall consent by endorsement on <br />the policy or policies, but the property insurance shall <br />not be canceled or permitted to lapse on account of <br />any such partial use or occupancy <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br />6 01 Supervision and Superintendence <br />A. CONTRACTOR shall supervise, inspect, and <br />direct the Work competently and efficiently, devoting <br />such attention thereto and applying such skills and <br />expertise as may be necessary to perform the Work in <br />accordance with the Contract Documents. CON- <br />TRACTOR shall be solely responsible for the means, <br />methods, techniques, sequences, and procedures of <br />construction, but CONTRACTOR shall not be <br />responsible for the negligence of OWNER or <br />ENGINEER in the design or specification of a specific <br />00700 - General Conditions REV 5-10-13 <br />00700-18 <br />F \Public Works\ENGINEERING DIVISION PROJECTS11213B-IRC Shooting Range Skeet & Trap Phase 21Admin\bid documents\Master Contract Documents\00700 - General Conditions <br />REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.