Laserfiche WebLink
G. Construction Site Egress Driveways: Minimize the transport of sediment and soil <br />from the construction site or work area by vehicle wheels. Construct a crushed <br />rock driving surface at the vehicle ezit point(s). Locate the site egress driveways <br />a minimum of 25 feet from all drainage inlets or pipes. Provide an area large <br />enough to remove the sediment and soil from vehicle wheels before the vehicle <br />leaves the construction site or work area. Provide wash -down stations as required <br />to wash vehicle tires and retain all washwater on-site. Do not use limerock. <br />H. Rock and Stone for Erosion Control and Pollution Control and Treatment: <br />1. Crushed Limerock: Limerock shall not be used under any <br />circumstance. <br />2. Acceptable Material: FDOT #4 non -calcareous aggregate, washed and <br />meeting the requirements of FDOT Standard Specifications for Road and <br />Bridge Construction, Section 901. <br />I. Hay Bales: Hay bales shall not be used. <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to <br />minimize erosion and capture and remove pollutants from the construction site and <br />from all other areas disturbed by construction activities. <br />B. Apply polyacrylamide in strict accordance with the polyacrylamide <br />manufacturer/supplier's recommendations and specifications. <br />C. REPAIR ALL EROSION DAMAGE — At no additional cost to the OWNER and <br />regardless of the state of completion of the Work, immediately clean all dirt and <br />debris from all pipes and drainage structures; and repair all flooding, washouts, <br />and all other erosion damage to the Work. This responsibility shall not end until <br />Final Acceptance of the Work by the OWNER. Included is damage caused by <br />erosion of any kind (e.g. wind, waves, stormwater runoff, hurricanes, etc.) including <br />Acts of God. Restore all erosion damaged areas to design grades and elevations. <br />Also, refer to General Conditions 6.13.B. <br />The remainder of this page was left blank intentionally] <br />Page 17 <br />P\ Public Works\ENGINEERING DIVISION PROJECTS\1213B-IRC Shooting Range Skeet & Trap Phase 2\Admin\bid documents\Addendums\Addendum No. 3 Updated Section 104 <br />Technical Specs.docx <br />