My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-241A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-241A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:04:20 AM
Creation date
1/11/2016 11:38:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-241A
Agenda Item Number
8.L.
Entity Name
West Construction Inc.
Subject
Contrac and Specifications
Skeet and Trap Facility Improvements
Indian River Count Public Shooting Range
Area
Indian River County Public Shooting Range
Project Number
1213B
Bid Number
2016008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Construction Site Egress Driveways: Minimize the transport of sediment and soil <br />from the construction site or work area by vehicle wheels. Construct a crushed <br />rock driving surface at the vehicle ezit point(s). Locate the site egress driveways <br />a minimum of 25 feet from all drainage inlets or pipes. Provide an area large <br />enough to remove the sediment and soil from vehicle wheels before the vehicle <br />leaves the construction site or work area. Provide wash -down stations as required <br />to wash vehicle tires and retain all washwater on-site. Do not use limerock. <br />H. Rock and Stone for Erosion Control and Pollution Control and Treatment: <br />1. Crushed Limerock: Limerock shall not be used under any <br />circumstance. <br />2. Acceptable Material: FDOT #4 non -calcareous aggregate, washed and <br />meeting the requirements of FDOT Standard Specifications for Road and <br />Bridge Construction, Section 901. <br />I. Hay Bales: Hay bales shall not be used. <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to <br />minimize erosion and capture and remove pollutants from the construction site and <br />from all other areas disturbed by construction activities. <br />B. Apply polyacrylamide in strict accordance with the polyacrylamide <br />manufacturer/supplier's recommendations and specifications. <br />C. REPAIR ALL EROSION DAMAGE — At no additional cost to the OWNER and <br />regardless of the state of completion of the Work, immediately clean all dirt and <br />debris from all pipes and drainage structures; and repair all flooding, washouts, <br />and all other erosion damage to the Work. This responsibility shall not end until <br />Final Acceptance of the Work by the OWNER. Included is damage caused by <br />erosion of any kind (e.g. wind, waves, stormwater runoff, hurricanes, etc.) including <br />Acts of God. Restore all erosion damaged areas to design grades and elevations. <br />Also, refer to General Conditions 6.13.B. <br />The remainder of this page was left blank intentionally] <br />Page 17 <br />P\ Public Works\ENGINEERING DIVISION PROJECTS\1213B-IRC Shooting Range Skeet & Trap Phase 2\Admin\bid documents\Addendums\Addendum No. 3 Updated Section 104 <br />Technical Specs.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.