F, Submit to SJRWMD a "Notice to District of Dewatering Activity" (SJRWMD Form <br />No. 40C-2.900(12)) prior to commencement of dewatering in accordance with <br />F.A.C. 40C-2.042(9). Provide a copy of the Notice to Indian River County. <br />1.2 PERMITS <br />A. The OWNER has obtained certain permits for this project and they are listed in <br />paragraph 6.08.B of the EJCDC Standard General Conditions of the Construction <br />Contract (General Conditions). Per paragraph 6.08.0 of the General Conditions, <br />apply for and obtain all other required federal, state, and local permits, licenses, <br />sampling, and tests. <br />B. Provide copies of all approved permits to the OWNER and ENGINEER and comply <br />with all conditions contained in all permits at no extra cost to the OWNER. If there <br />is a conflict between any permit requirement and these Specifications or <br />requirements between permits, the more stringent specification or requirement <br />shall govern. <br />C. Pay for all required water quality sampling and laboratory tests. <br />1.3 GENERAL <br />A. Do not begin any other construction work until the pollution control and treatment <br />system has been constructed in accordance with approved plans, permits, and <br />these Specifications; and the installed system has been examined by the OWNER <br />for compliance. <br />B. From time to time, the OWNER or ENGINEER will inspect the pollution control and <br />treatment system and may take effluent samples for analysis by a testing <br />laboratory selected and paid for by the OWNER. If at any time, the OWNER or <br />ENGINEER determines that the pollution control and treatment system is not in <br />compliance with the approved system, the OWNER or ENGINEER will shut the <br />portion of the project down that is not in compliance, and it shall remain shut -down <br />until the pollution control and treatment system is properly constructed or repaired, <br />and complies with the approved pollution control and treatment system plans, <br />specifications, contract documents, and permits. <br />C. Schedule construction to minimize erosion and stormwater runoff from the <br />construction site. Implement erosion control measures on disturbed areas as soon <br />as practicable in portions of the site where construction activities have temporarily <br />or permanently ceased, but in no case more than 7 days after the construction <br />activity in that portion of the site has temporarily or permanently ceased. In <br />addition to other temporary erosion control measures that may be implemented, <br />application of polyacrylamide is required on all such disturbed areas within 7 days <br />after the construction activity in that portion of the site has temporarily or <br />permanently ceased, unless final landscaping has been installed. Polyacrylamide <br />application shall be as specified herein. Include polyacrylamide application in the <br />Project's SWPPP. <br />Page 12 <br />P\Public Works\ENGINEERING DIVISION PROJECTS\1213B-IRC Shooting Range Skeet & Trap Phase 2\Admin\bid documents\Addendums\Addendum No. 3 Updated Section 104 <br />Technical Specs.docx <br />