My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/19/1986
CBCC
>
Meetings
>
1980's
>
1986
>
2/19/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:00 AM
Creation date
6/12/2015 11:30:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/19/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 22, 1986 <br />Mr. Sonny Dean <br />Director of General Services <br />Indian River County <br />1840 25th Street <br />Vero Beach, Florida 32960 <br />RE: -INDIAN RIVER COUNTY JAIL <br />Boor 6J Pf,: 687 <br />FRIZZELL ARCHITECTS <br />1766 <br />JAN 1586 <br />RECEIVED <br />Genera <br />Services <br />Dear Mr. Dean: <br />Following is a list of independent cost estimating firms which we <br />believe are qualified to prepare responsible estimates for the <br />jail addition. CMS is a relatively small Florida firm, while MDA <br />has a large international operation. The other two are national <br />f irms with Florida branches. Shall I ask them to send you <br />brochures? <br />vf. CONSTRUCTION COST SYSTEMS <br />Suite 2021 <br />5700 Memorial Drive <br />Tampa, Florida 33615 <br />(813) 887-5600 <br />w% CMS INTERNATIONAL, INC. <br />1031 Sunset Drive <br />Miami, Florida 33173 <br />(305) 596-5082 <br />3. HANSCOMB ASSOCIATES, INC. <br />One Tampa City Center <br />Tampa, Florida 33602 <br />(813) 273-8063 <br />4. MDA <br />Suite 400 <br />699 Prince Street <br />Alexandria, Virginia 22314 <br />(703) 836-0880 <br />Sincerely, <br />W. R. FRIZZ ARCHITE , I C. <br />George H. Bai� A <br />President <br />MOTION WAS MADE by Commissioner Lyons, SECONDED by <br />Commissioner Bowman, that the Board approved staff's <br />recommendation to contract with Construction Cost <br />Systems and Hanscomb Associates, Inc. for a total price <br />of $8500 for costing out the construction of the second <br />phase of the new Jail. <br />54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.