My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-004
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 11:58:52 AM
Creation date
1/14/2016 11:58:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/12/2016
Control Number
2016-004
Agenda Item Number
8.R.
Entity Name
Kimley-Horn and Associates
Subject
Hobart Reverse Osmosis Skids Membrane Replacement
Work Order No.5
Area
North Hobart RO Water Treatment Plant
Alternate Name
CERT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Consultant will utilize the services of Control Systems Design, who is familiar with the PLC and <br /> HMI programming. <br /> Consultant will review the completeness of existing code for all interfaces and control logic being <br /> in place and operational to support train#7 addition. Perform modifications to complete the <br /> programming to provide functionality presently available for the other trains. <br /> Consultant will provide onsite checkout and verification of instrumentation and equipment <br /> configuration and current existing train#7 operation, including input/output(UO)and <br /> fiuictionality prior to operational startup. <br /> Consultant will perform modifications necessary to implement the configuration. <br /> Consultant will provide up to one-day of offsite remote assistance for startup and operational <br /> testing. <br /> TIME SCREDULE <br /> Consultant will complete these tasks in a timely and mutually agreed upon schedule,and <br /> concurrently with the other related purchase order PO#71787-00. <br /> FEESCHEDULE <br /> We will provide these services in accordance with our Continuing Services Contract Agreement <br /> for Professional Services dated November 41,2014,with Indian River County. <br /> The Consultant will provide professional services for Task 1 through Task 3 on a lump sum fee <br /> basis as follows: <br /> Task.No. 'Task Task Fee <br /> Task 1 U date Drawin s& Specifications $ 4,100 <br /> Task 2 Permitting S 5,700 <br /> Task 3 Observation and Startup $14,780 <br /> Task 4 SCADA Implementation S 7 800 <br /> Total Lump Sum Fee= $32 380 <br /> ADDITIONAL SERVICES <br /> The following services are not included in the Scope of Services for this project, but may be <br /> required depending on circumstances that may arise during the execution of this project. <br /> Additional services include, but may not be limited to the following: <br /> e Design drawings of any modification to the RO skids <br /> ii <br /> KAWPB Civi11044572035-Hobart Membrane Repiacement\SeopelHobars Membrane Replacement 5&8 Additional services <br /> rcv l.docx <br /> Pap 3of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.