Laserfiche WebLink
1 <br /> Consultant will utilize the services of Control Systems Design, who is familiar with the PLC and <br /> HMI programming. <br /> Consultant will review the completeness of existing code for all interfaces and control logic being <br /> in place and operational to support train#7 addition. Perform modifications to complete the <br /> programming to provide functionality presently available for the other trains. <br /> Consultant will provide onsite checkout and verification of instrumentation and equipment <br /> configuration and current existing train#7 operation, including input/output(UO)and <br /> fiuictionality prior to operational startup. <br /> Consultant will perform modifications necessary to implement the configuration. <br /> Consultant will provide up to one-day of offsite remote assistance for startup and operational <br /> testing. <br /> TIME SCREDULE <br /> Consultant will complete these tasks in a timely and mutually agreed upon schedule,and <br /> concurrently with the other related purchase order PO#71787-00. <br /> FEESCHEDULE <br /> We will provide these services in accordance with our Continuing Services Contract Agreement <br /> for Professional Services dated November 41,2014,with Indian River County. <br /> The Consultant will provide professional services for Task 1 through Task 3 on a lump sum fee <br /> basis as follows: <br /> Task.No. 'Task Task Fee <br /> Task 1 U date Drawin s& Specifications $ 4,100 <br /> Task 2 Permitting S 5,700 <br /> Task 3 Observation and Startup $14,780 <br /> Task 4 SCADA Implementation S 7 800 <br /> Total Lump Sum Fee= $32 380 <br /> ADDITIONAL SERVICES <br /> The following services are not included in the Scope of Services for this project, but may be <br /> required depending on circumstances that may arise during the execution of this project. <br /> Additional services include, but may not be limited to the following: <br /> e Design drawings of any modification to the RO skids <br /> ii <br /> KAWPB Civi11044572035-Hobart Membrane Repiacement\SeopelHobars Membrane Replacement 5&8 Additional services <br /> rcv l.docx <br /> Pap 3of3 <br />