Laserfiche WebLink
EXHIBIT "A" <br />SCOPE OF WORK <br />Indian River County Board of Commissioners <br />1.840 25th St. <br />Vero Beach, Fl. 32960 <br />Re: Indian River County Court House <br />Re -Roof <br />1) Remove existing roofing from roofs and job site. <br />2) Prime concrete surfaces with asphalt primer including parapit <br />wall surfaces. <br />3) Install new cant strips at roof/wall junctons. <br />4) Install Brai Sp -4 heat fused directly to concrete substrate <br />and KMM on parapit walls. <br />5) Install new lead stacks, aluminum flashings at parapit walls <br />and termination bars at wall termination points. <br />6) A/C units removed and replaced on new supports by others. <br />7) Coat all Brai Sp -4 with aluminum roof coating. <br />The above scope of work shall be done in a First Class Workmanlike <br />Manner and Guaranteed for a period of 12 years by U.S. Intec, Inc. <br />per warranty specimen. <br />Discussion ensued regarding the warranty and who actually is <br />backing it, and Commissioner Wodtke asked if an inspection is <br />done by the warranty company after the roof is installed so they <br />can insure that it was properly installed. <br />Superintendent Williams explained that we put the same type <br />roof on the warehouse and the Courthouse Annex, and the tear -off <br />is photographed as it goes and it is inspected by the manufac- <br />turer before you get a warranty stating that it is guaranteed. <br />THE CHAIRMAN CALLED FOR THE QUESTION. <br />It was voted on and carried unanimously. <br />.12TH STREET R/W ACQUISITION <br />Right -of -Way Agent Don Finney reviewed the following memo: <br />55 <br />FEB2 6 IJ86 <br />BOOK 63 mGE 768 <br />