My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-002A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-002A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2016 9:44:44 AM
Creation date
1/15/2016 9:44:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/12/2016
Control Number
2016-002A
Agenda Item Number
8.P.
Entity Name
Masteller and Moler
Subject
Gravity Sewer Project
Area
North County Sebastian
Project Number
Work Order No. 2
Alternate Name
Sanitary Sewer for North Sebastian Area
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 29, 2015 <br /> NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> "EXHIBIT 1c" <br /> WORK ORDER NO.2 <br /> (Time Schedule) <br /> Time of Performance <br /> The estimated time frame for completion of services from the approval of this Work Order <br /> is as follows: <br /> MILESTONE COMPLETION DATE <br /> Tasks A, B, and C 240 Calendar Days after Notice To Proceed <br /> Note: <br /> The time for completion of the 60% design drawings, permit applications and Engineer's <br /> Opinion of Probable Construction Cost for the project shall be four (4) months from notice <br /> to proceed. Once permits are received, 100% design drawings shall be completed in thirty <br /> (30) calendar days thereafter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.