My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-242A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-242A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:13:46 AM
Creation date
1/19/2016 10:39:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-242A
Agenda Item Number
8.K.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents & Specifications
Old Dixie Highway Resurfacing
Area
71st St. to CR 510 Old Dixie
Project Number
1138
Bid Number
2016001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 07 Patent Fees and Royalties. ... 22 <br />6.08 Permits. 22 <br />6.09 Laws and Regulations.... 22 <br />6 10 Taxes ... . . . 22 <br />6.11 Use of Site and Other Areas .... 22 <br />6.12 Record Documents. 23 <br />6.13 Safety and Protection .23 <br />6 14 Safety Representative.. ... ....... .24 <br />6 15 Hazard Communication Programs .24 <br />6 16 Emergencies. .24 <br />6 17 Shop Drawings and Samples ...24 <br />6 18 Continuing the Work 25 <br />6.19 CONTRACTOR's General Warranty and Guarantee 25 <br />6.20 Indemnification 26 <br />ARTICLE 7- OTHER WORK... . .26 <br />7 01 Related Work at Site .26 <br />7 02 Coordination . 27 <br />ARTICLE 8- OWNER'S RESPONSIBILITIES .27 <br />8.01 Communications to Contractor...27 <br />8.02 Replacement of ENGINEER.... .27 <br />8 03 Fumish Data 27 <br />8.04 Pay Promptly When Due 27 <br />8 05 Lands and Easements; Reports and Tests 27 <br />8.06 Insurance. 28 <br />8.07 Change Orders .28 <br />8.08 Inspections, Tests, and Approvals .28 <br />8 09 Limitations on OWNER's Responsibilities . .28 <br />8.10 Undisclosed Hazardous Environmental Condition 28 <br />8 11 Evidence of Financial Arrangements 28 <br />ARTICLE 9- ENGINEER'S STATUS DURING CONSTRUCTION .28 <br />9.01 OWNER'S Representative .28 <br />9.02 Visits to Site .28 <br />9 03 Project Representative 28 <br />9 04 Clarifications and Interpretations.. 29 <br />9 05 Authorized Variations in Work.... 29 <br />9 06 Rejecting Defective Work .... 29 <br />9.07 Shop Drawings, Change Orders and Payments . 29 <br />9.08 Determination for Unit Price Work .29 <br />9 09 Decisions on Requirements of Contract Documents and Acceptability of Work 29 <br />9.10 Limitations on ENGINEER's Authority and Responsibilities ..30 <br />ARTICLE 10- CHANGES IN THE WORK, CLAIMS. 30 <br />10 01 Authorized Changes in the Work 30 <br />10 02 Unauthorized Changes in the Work 30 <br />10.03 Execution of Change Orders 30 <br />10 04 Notification to Surety 31 <br />10.05 Claims and Disputes ....31 <br />ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES, UNIT PRICE WORK. <br />11 01 Cost of the Work. <br />32 <br />32 <br />00700 - General Conditions REV 5-10-13 rev <br />00700 - 3 <br />F\Public Works\ENGINEERING DIVISION PROJECTS \ 1138-01d Dixie Hwy Resurfacing-7Ist St to CR 510 \ Admim \bid documents\Master Contract Documents \ 00700 - General Conditions REV 5-10-13 <br />rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.