My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-242B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-242B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:24:39 AM
Creation date
1/19/2016 11:02:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-242B
Agenda Item Number
8.M.
Entity Name
Blue Goose Construction
Subject
Contract Documents & Specifications
34th Avenue Intersection Improvements
Area
1st. St. SW and 43rd Ave.Intersections
Project Number
1232
Bid Number
2016002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00800 - SUPPLEMENTARY CONDITIONS <br />TO THE GENERAL CONDITIONS <br />Article Title Article Number <br />Introduction SC — 1.00 <br />Defined Terms SC — 1 01 <br />Terminology SC — 1.02 <br />Before Starting Construction SC — 2.05 <br />Preconstruction Conference SC — 2 06 <br />Coordination of Plans, Specifications, and Special Provisions SC — 3.06 <br />Subsurface and Physical Conditions SC — 4 02 <br />Performance, Payment and Other Bonds SC — 5.01 <br />Certificates of Insurance SC — 5 03 <br />CONTRACTOR's Liability Insurance SC — 5 04 <br />OWNER's Liability Insurance SC — 5 05 <br />Property Insurance SC — 5.06 <br />Waiver of Rights SC — 5.07 <br />Receipt and Application of Insurance Proceeds SC — 5.08 <br />Acceptance of Bonds and Insurance; Option to Replace SC — 5.09 <br />Labor; Working Hours SC — 6 02 <br />Concerning Subcontractors, Suppliers and Others SC — 6.06 <br />Permits SC — 6 08 <br />Cost of the Work SC — 11.01 <br />Test and Inspections SC — 13.03 <br />OWNER May Stop the Work SC — 13.05 <br />Correction Period SC — 13.07 <br />Progress Payments SC — 14.02 <br />Substantial Completion SC — 14.04 <br />00800-i <br />00800 - Supplementary Conditions 05-13 rev <br />00800 IF -\Public Works\ENGINEERING DIVISION PROJECTS\1232-1st St SW 43rd Ave Intersec ImprovWdmim\bid documents\Master Contract Documents\00800 - <br />Supplementary Conditions 05-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.