My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-242B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-242B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:24:39 AM
Creation date
1/19/2016 11:02:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-242B
Agenda Item Number
8.M.
Entity Name
Blue Goose Construction
Subject
Contract Documents & Specifications
34th Avenue Intersection Improvements
Area
1st. St. SW and 43rd Ave.Intersections
Project Number
1232
Bid Number
2016002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUESTION NO. 1 <br />How much would the County charge for county staff & and or third party inspectors to work outside the <br />normal working hours if work outside the normal working hours was granted by the county? <br />ANSWER NO. 1 <br />Hourly rates for County Staff outside normal work hours vary. The maximum rate would be $50.00 per <br />hour for County Staff. Testing or other outside inspections would be assessed to the Contractor as billed <br />to the county. <br />QUESTION NO. 2 <br />SC4.02 Indicates that the County did not rely on any Roadway Soil Survey, is there soil borings for this <br />project? <br />ANSWER NO. 2 <br />Soil borings are not available for this project. <br />QUESTION NO. 3 <br />Is the Contractor responsible for performing soil borings? <br />ANSWER NO. 3 <br />The Contractor is not responsible for obtaining soil borings. <br />QUESTION NO. 4 <br />Is the Contractor responsible for hiring a third party geotechnical engineer to oversee construction and <br />test per FDOT standards? <br />ANSWER NO. 4 <br />(See SECTION 00800 SUPPLEMENTARY CONDITIONS TO THE GENERAL CONDITIONS, SC -13.03) <br />Page 2 of 11 <br />F\Public Works\ENGINEERING DIVISION PROJECTS \I232 -1st St SW_43rd Ave Intersec Improv\Admim\Addendums\Addendum No 1 10-21-15 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.