SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Blue Goose Construction, LLC <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />'The proposed improvements to the 1st Street S.W. and 43rd Avenue intersection will <br />consist of the reconstruction of a portion of 1st Street S.W. with the addition of left turn lanes in <br />the east and west bound direction. 43rd Avenue will be milled and resurfaced within the <br />intersection. Approximately 2,170 feet of 48" x 76" reinforced concrete pipe will be installed in <br />the Indian River Farms Water Control District Canal. The work will also include; a traffic signal, <br />four foot wide paved shoulders, curbing, and a five foot wide sidewalk along the north side of <br />the right-of-way, signing, and pavement markings. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: 1st Street S.W. and 43rd Avenue Intersection Improvements <br />County Project Number: 1232 <br />Bid Number: 2016002 <br />Project Address: 1st Street S.W. at 43rd Avenue, Vero Beach, FL <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />00520 - Agreement (Public Works) REV 06-14 <br />00520 - 2 <br />F:\Purchasing\Bids12015-2016 FY (2016000)\2016002 -1st Street and 43rd Avenue Intersection Improvements\00520 - Agreement (Public Works) REV 06-14.doc <br />