My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-242B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-242B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:24:39 AM
Creation date
1/19/2016 11:02:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-242B
Agenda Item Number
8.M.
Entity Name
Blue Goose Construction
Subject
Contract Documents & Specifications
34th Avenue Intersection Improvements
Area
1st. St. SW and 43rd Ave.Intersections
Project Number
1232
Bid Number
2016002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 <br />OWNER Indian River County <br />CONTRACTOR - <br />Project No : 1232 <br />Project Description* The proposed improvements to the 1st Street S.W. and 43rd Avenue <br />intersection will consist of the reconstruction of a portion of 1St Street S.W. with the addition of <br />left turn lanes in the east and west bound direction. 43rd Avenue will be milled and resurfaced <br />within the intersection. Approximately 2,170 feet of 48" x 76" reinforced concrete pipe will be <br />installed in the Indian River Farms Water Control District Canal. The work will also include, a <br />traffic signal, four foot wide paved shoulders, curbing, and a five foot wide sidewalk along the <br />north side of the right-of-way, signing, and pavement markings. <br />OWNER's Bid No. 2016002 <br />CONTRACT FOR: 1st Street S.W. and 43rd Avenue Intersection Improvements <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof' <br />To <br />OWNER <br />And To* <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within <br />00630 - Certificate of Substantial Completion REV 04-07 <br />00630 - 1 <br />F \Public Works\ENGINEERING DIVISION PROJECTS\1232-1st St SW_43rd Ave Intersec Improv\Admim\bid documents\Master Contract Documents\00630 - Certificate of <br />Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.