My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/22/2014
CBCC
>
Meetings
>
2010's
>
2014
>
01/22/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 3:55:27 PM
Creation date
1/19/2016 1:37:38 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Minutes
Meeting Date
01/22/2014
Meeting Body
Board of County Commissioners
Subject
Impact Fee Update
Tindale-Oliver and Associates, Inc. Presentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Ms. Kamp stated that the County has built the County Administration Building <br />Complex, the Transit Administration Building, Supervisor of Elections Building, and the <br />Emergency Operations Center since the last study, and there are plans to build new courtroom <br />facilities in the next five years. There was a methodology difference on the demand side, <br />because in this study they used the 24-hour functional population instead of the 11 -hour <br />operation. The inventory increased tremendously and the cost per person increased 16%, the <br />credit decreased, and the demand increased significantly due to the methodology change. The <br />full calculated fee for single family residential land use is $750, and all the non-residential fees <br />decreased. Since the credit is so much smaller, this is a case where you need most of the fee to <br />maintain the adopted LOS standard. <br />LIBRARIES <br />Ms. Kamp, while displaying several charts, stated that the Brackett Library was built <br />since the 2005 study, and no future projects are anticipated. Inventory increased and the actual <br />LOS achieved was an increase, but the adopted standards did not change, so they used the same <br />adopted LOS standards. The fee increase was driven mostly by reduction and credits. The cost <br />increased 9%, from $500 to $700 for a single family home. When they did the affordable <br />growth, since there is so little outside funding, most of the fee is needed to maintain the adopted <br />LOS. <br />Budget and Management Director Jason Brown and Administrator Joseph Baird <br />responded to Commissioner Zorc's inquiry that there is no library facility expansions scheduled <br />over the next five years, but with technology changes there will be an automation transformation <br />in the libraries. <br />Impact Fee Update Workshop <br />January 22, 2014 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.