Laserfiche WebLink
• <br />• <br />• <br />Indian River County 1 Impact Fee Update Study <br />Table IX -5 <br />Equipment/Buildings Replacement Cost <br />Facility „� <br />Description <br />p tion <br />Unit <br />Unit Value") <br />Community <br />Neighborhood/ <br />Parks <br />Regional Parks <br />Total Cost <br />Count X31 <br />" <br />' Total Value� <br />$275,000 <br />Count Isl <br />5 <br />1 Total Value(6) <br />$275,000 <br />Basketball Court <br />court <br />$55,000 <br />5 <br />$550,000 <br />Boat Ramp <br />ramp lane <br />$100,000 <br />0 <br />$0 <br />18 <br />$1,800,000 <br />$1,800,000 <br />Canoe Launch <br />launch <br />$188,000 <br />1 <br />$188,000 <br />4 <br />$752,000 <br />$940,000 <br />Community Center <br />sq ft <br />$180 <br />1,401 <br />$252,180 <br />6,006 <br />$1,081,080 <br />$1,333,260 <br />Dune Walkover <br />walkover <br />$43,000 <br />0 <br />$0 <br />7 <br />$301,000 <br />$301,000 <br />Fishing Pier <br />pier <br />$12,500 <br />1 <br />$12,500 <br />14 <br />$175,000 <br />$187,500 <br />Jogging Trails <br />mile <br />$150,000 <br />1.0 <br />$150,000/ <br />5.5 <br />$825,000 <br />$975,000 <br />Lifeguard Tower <br />tower <br />$25,000 <br />0 <br />' •..-$0 <br />5 <br />$125,000 <br />$125,000 <br />Maintenance Facility <br />sq ft <br />$100 <br />0 <br />i .; $0 <br />.., 8,850 <br />$885,000 <br />$885,000 <br />Multi -Purpose Bldg <br />sq ft <br />$150 <br />0 <br />'', . $0 <br />'/.76,600 <br />$11,490,000 <br />$11,490,000 <br />Olympic Aquatic Center <br />center <br />$3,000,000 <br />,,0 <br />'` $0 <br />\ , �,, 1 <br />$3,000,000 <br />$3,000,000 <br />Picnic Pavilion <br />pavilion <br />$40,000 <br />5 <br />/ $200,000 <br />54 <br />$2,160,000 <br />$2,360,000 <br />Playground <br />playground <br />$90,000 <br />_:._ <br />. , 5 <br />$450,0008 <br />\. <br />$720,000 <br />$1,170,000 <br />Restroom <br />restroom <br />$85,000 <br />` <br />`,,4 <br />$340,000 <br />28 <br />$2,380,000 <br />$2,720,000 <br />Soccer Field <br />field <br />$325,000 <br />'' 6, <br />40 <br />6 <br />$1,950,000 <br />$1,950,000 <br />Softball Field <br />field <br />$500,000 <br />`2 <br />!,$1,000,000' <br />12 <br />$6,000;000 <br />$7,000,000 <br />Swimming Pool <br />pool <br />$2,000,000 <br />0 <br />\ . ''". - $0 <br />1 <br />$2,000,000 <br />$2,000,000 <br />Tennis Courts <br />court <br />'• /$50,000 <br />, <br />1 <br />' . $50,000 <br />4 <br />$20,000 <br />$250,000 <br />Volleyball Court <br />court <br />' $20,000 <br />' "'- <br />. 1 <br />$20,000 <br />3 <br />$60,000 <br />$80,000 <br />Facilities and Equipment Replacement Value <br />$2,937,680 <br />. <br />$36,179,080 <br />$39,116,760 <br />Architecture, Engineering, and Inspection @ 12.5%(8),$367,210 <br />$4,522,385 <br />$4,889,595 <br />Total Facilities and Equipment Replacement Valuel'I <br />$3,304,890 <br />$40,701,465 <br />$44,006,355 <br />Total Number ofAcres1101 ' , / _\ <br />35.38 <br />511.27 <br />546.65 <br />Facilities and Equipment Value_per Acrel" \ \ <br />$93,411 <br />$79,609 <br />$80,502 <br />Level-of-Service(12) <br />0.36 <br />5.23 <br />5.59 <br />Facilities and Equipment Value per Resident(13) - <br />$33.63 <br />$416.36 <br />$449.99 <br />(1) <br />(2) <br />(3) <br />(4) <br />(5) <br />(6) Unit replacement value (Item2) multiplied by the number of units per facility (Item 5) <br />(7) Sum of the total value for community parks (Item 4) and the total value of regional parks (Item 6) <br />(8) Facility and equipment`value inultiplied by 12.5% based on discussions with Indian River County <br />(9) Sum of the facilities and_equipment replacement value and the architecture, engineering, and inspection <br />cost (Item 8) for each park. -- <br />(10) Source: Table IX -1 <br />(11) Total facilities and equipment cost (Item 9) divided by the total number of acres (Item 10) for each park <br />type <br />(12) Source: Table IX -2 <br />(13) Facilities and equipment value per acre (Item 11) multiplied by the level -of -service (Item 12) divided by <br />1,000 <br />Source: Table_IX-T -- <br />Ba'sed on insurance values of existing,facilities, iriformation from previous studies for IRC as well as <br />information from other -Florida jurisdictions <br />Source.°Table IX -1 • -.\ <br />Unit value (Item 2) multiplied by,the number of units per facility (Item 3) <br />Source: Table IX -1 t <br />Tindale -Oliver & Associates, Inc. Indian River County <br />January 2014 93 Impact Fee Update Study <br />