My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/22/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
01/22/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 4:01:18 PM
Creation date
1/19/2016 1:58:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
01/22/2014
Meeting Body
Board of County Commissioners
Subject
Impact Fee Update Study Workshop
Tindale-Oliver & Associates, Inc.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Indian River County I Impact Fee Update Study <br />State Roadway Costs <br />This section examines the ROW, construction, and other cost components associated with <br />state roads with respect to transportation capacity improvements in Indian County. For this <br />purpose, recent bid data from state roadway projects throughout Florida and the FDOT's <br />Long Range Estimates (LRE) were used to identify and provide supporting cost data for state <br />improvements. The cost for each roadway capacity project was separated into four phases: <br />design, CEI, ROW and construction. <br />Design and CEI <br />Design costs for state roads were estimated at 9 percent construction phase costs based on <br />a review of cost data collected for recent transportation impatt fee studies throughout <br />Florida. Additional detail is provided in Appendix C, Table C-10. <br />CEI costs for state roads were estimated at 11 percentofconstruction phase costs based on <br />a review of cost data collected `for.s.recent transportation impact fee studies throughout <br />Florida. Additional detail is provided in Appendix C, Table C`16. <br />Right -of -Way <br />Due to a lack of :local right-of-way acquisition,, cost data._ for state roads in Indian River <br />County, a review of 'ROW costs from recent transportation fee studies throughout Florida <br />was conducted: -.Based ori:this review, ROW for state roadways was estimated at 44 percent <br />of the construction cost for•.state roads: As shown in Table X-2, this amount is equal to <br />ti. <br />approximately $0.78 million Per :lane mile. Additional detail is provided in Appendix C, <br />Table C11.2.\ <br />\ <br />• <br />Construction `\.. <br />A review of recent`.state ,road capacity improvements in Indian River identified three <br />projects from 2008 and' 2009"(SR 60 and SR 5 widening). These three projects averaged <br />approximately $2.95 million per lane mile for construction. However, due to the small <br />sample size, these projects were blended with 49 additional capacity expansion projects <br />throughout Florida, which resulted in a weighted average cost of $2.44 million per lane <br />mile. An analysis of county roadway improvements, where a larger sample of local projects <br />was available, in relation to statewide county road improvements, indicated that <br />construction costs average approximately 83 percent of construction costs statewide. <br />Based on this conclusion, the construction costs for state roadways in Indian River County <br />Tindale -Oliver & Associates, Inc. Indian River County <br />January 2014 108 Impact Fee Update Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.