Laserfiche WebLink
0 <br />• <br />a <br />Indian River County 1 Impact Fee Update Study <br />Table C-8 <br />CEI Cost Adjustment — County Roads <br />Road Type <br />CEI Cost per Lane <br />Mile(i) <br />Section Design, <br />Distribution(z) <br />Weighted -CEI)" <br />Cost per Lanel <br />i. <br />Urban Design <br />$220,000 <br />34% <br />Mile i <br />Urban Design <br />$162,000 <br />34% <br />$55,000 <br />Rural Design <br />$134,000 <br />66% <br />$88,000 <br />Weighted Average CEI Cost per LaneMile <br />$143,000 <br />(1) CEI cost is estimated at 9% of construction cost basedfon recent TIF studies in <br />Table C-16 (Item a). <br />(2) Source: Appendix C, Table C-17 (Items c and d),E:f3 <br />(3) CEI cost per lane mile (Item 1) multiplied by theassociated`s ection design weight <br />(Item 2) for each design type and added together. <br />State Roadways <br />The CEI cost factor for state roads was estimated: as a percentage of the construction cost <br />per lane mile. This factor was determined through a re iew of the CEI -to -construction cost <br />ratios for state road unit costs in -previously completed impact fee studies throughout <br />Florida. For state roadways, the CEI ranged from 8 percent to 17 percent, with a <br />weighted average of 113percent. For purposes of this.„updatee:study, the CEI cost for state <br />:_\ _s <br />roads was calculated at=11 percent of the`construction'cost.per lane mile (see Table C-16 for <br />�z <br />additional information)._ <br />Table C;5 <br />CE ,Cost Adjustment= State Roads <br />Road Type <br />CEI Cost per Lane, <br />Mile <br />SectionDesign <br />'2' <br />Distribution <br />Weighted CEI ” <br />Cost per Lane <br />Milef,.. <br />(3) <br />Urban Design <br />$220,000 <br />34% <br />$75,000 <br />Rural Design <br />$183,000 <br />66% <br />$121,000 <br />Weighted Average CEI Cost per Lane Mile <br />$196,000 <br />(1) CEI cost is estimated at 11% of construction cost based on recent TIF studies in <br />Table C-16 (Item1b) <br />(2) Source: Appendix C, Table C-17 (Items c and d) <br />(3) CEI cost per lane mile (Item 1) multiplied by the associated section design weight <br />(Item 2) for each design type and added together. <br />Tindale -Oliver & Associates, Inc. <br />January 2014 <br />Indian River County <br />C-7 Impact Fee Update Study <br />